BLD-Final | 2/13/2001 | 2/13/2001 | 2/13/2001 | P | PASS |
Jim Sly
|
|
|
Emmett ###-#### C/C issued 2/13/2001 1:57:51 PM
|
BLD-Final | 2/2/2001 | 2/5/2001 | 2/5/2001 | A | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 02/02/2001 at 13:03:30. Contact: ###-####. need tempered glass ground floor master bed rm 2/5/2001 12:10:48 PM
|
BLD-Energy code compliance | 10/26/2000 | 10/27/2000 | 10/27/2000 | A | CANC |
Jim Sly
|
|
|
###-#### Done by 425 10/27/2000 9:10:20 AM
|
BLD-Framing/Rough-in | 10/24/2000 | 10/25/2000 | 10/25/2000 | A | PART |
Jim Sly
|
|
|
###-#### Complete prev shear corr notice. 10/25/2000 10:44:21 AM
|
BLD-Framing/Rough-in | 9/19/2000 | 9/19/2000 | 9/19/2000 | P | PART |
Jim Sly
|
|
|
shear wall- emmett ###-#### shear wall- Nailing...OK emmett ###-#### 9/19/2000 4:28:16 PM
|
BLD-Foundation | 7/27/2000 | 7/27/2000 | 7/27/2000 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 07/27/2000 at 06:43:24. Contact: ###-####.
|
BLD-Footing | 7/25/2000 | 7/26/2000 | 7/26/2000 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 07/25/2000 at 15:01:58. Contact: ###-####. foot appears OK 7/26/00 9:25:37 AM
|