BLD-Final | 10/24/2000 | 10/26/2000 | 10/26/2000 | A | PASS |
Russ Owen
|
|
|
robert ###-####
|
BLD-Final | 10/16/2000 | 10/17/2000 | 10/17/2000 | A | FAIL |
Russ Owen
|
|
|
key on f/p vent --fn occ bob ###-#### c/n posted. 10/17/2000 1:02:20 PM
|
BLD-Energy code compliance | 7/20/2000 | 7/21/2000 | 7/21/2000 | A | PASS |
Russ Owen
|
|
|
ROBERT ###-#### ENERGY CODE Floor insulation required 7/21/00 2:14:40 PM
|
BLD-Energy code compliance | 7/19/2000 | 7/20/2000 | 7/20/2000 | P | FAIL |
Russ Owen
|
|
|
Robert ###-#### Need new mech check for R-13 and need to complete 7/21/00 2:12:54 PM
|
BLD-Framing/Rough-in | 7/18/2000 | 7/19/2000 | 7/19/2000 | A | PASS |
Russ Owen
|
|
|
robert ###-#### R-15 walls and R-19 floor required. 7/19/00 3:28:48 PM
|
BLD-Framing/Rough-in | 7/17/2000 | 7/18/2000 | 7/18/2000 | A | FAIL |
Russ Owen
|
|
|
robert ###-#### C/N posted 7/18/00 2:22:30 PM
|
BLD-Framing/Rough-in | 7/5/2000 | 7/5/2000 | 7/5/2000 | P | PASS |
Russ Owen
|
|
|
shear reinspection Robert ###-####
|
BLD-Framing/Rough-in | 6/27/2000 | 6/27/2000 | 6/28/2000 | P | FAIL |
Russ Owen
|
|
|
shear wall robert ###-#### C/N 6/29/00 10:22:15 AM
|