BLD-Final | 10/26/2000 | 10/26/2000 | 10/26/2000 | P | PASS |
Dave Hannah
|
|
|
ELLIOTT- ###-#### FN
|
BLD-Final | 10/24/2000 | 10/25/2000 | 10/25/2000 | A | NR |
Dave Hannah
|
|
|
###-####.nr reschedule.
|
BLD-Final | 10/25/2000 | 10/25/2000 | 10/25/2000 | P | FAIL |
Dave Hannah
|
|
|
elliott ###-####. CN issued.
|
BLD-Energy code compliance | 7/19/2000 | 7/19/2000 | 7/19/2000 | P | PASS |
Jim Sly
|
|
|
Elliot ###-####
|
BLD-Framing/Rough-in | 7/17/2000 | 7/18/2000 | 7/18/2000 | A | PASS |
Jim Sly
|
|
|
elliott ###-#### Req. underfloor insul...check @ final. 7/18/00 12:00:09 PM
|
BLD-Framing/Rough-in | 7/10/2000 | 7/11/2000 | 7/11/2000 | A | PASS |
Tom Arcoraci
|
|
|
elliott ###-#### shear wall insp Ok to side 7/11/00 4:38:59 PM
|
BLD-Framing/Rough-in | 7/10/2000 | 7/10/2000 | 7/10/2000 | P | FAIL |
Jim Sly
|
|
|
shear nail-- ###-#### elliott Nail per Eng. Need underfl insul 7/10/00 1:20:21 PM
|
BLD-Foundation | 6/7/2000 | 6/8/2000 | 6/8/2000 | A | PART |
Jim Sly
|
|
|
foundation wall steve ###-####
|
BLD-Footing | 6/7/2000 | 6/7/2000 | 6/7/2000 | P | PART |
Jim Sly
|
|
|
###-####--steve--ft Foot appears ok 6/13/00 3:22:39 PM
|