Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD00-01476
StatusFinaled
Name UBIQUITEL
Site Address 1256 E EXCHANGE ST
Project NameGOWEN BUSINESS PARK
Customer Number 
ePlanReviewNo
Description
To remodel an 11553 sq ft portion of an existing 29612 sq ft shell building to create a telephone switching tenant per approved plans and attached engineering. Work to include, construction of a one-hour fire-resistive tenant demising wall, construct a new roof system withing the tenants area for protection of electrical equipment, construct new interior partitions for new offices, generator room, server area, storage area, two new fully accessible restrooms, the installation of an emergency generator system with fuel tank located in an enclosed fenced area on the exterior of the building, new mechanical condenser units being installed, new electrical work, new plumbing work, installation of a suspended ceiling system. Related miscellaneous interior finishes. Exterior work to be performed per DRH#97-00095 and notes on plans. This building is fully fire sprinklered for area increase, any alterations or modifications to the fire sprinkler system shall be per UBC standard 9-1, as regulated by the fire department. *(pc385-00)*RMH* *Provide separate plan reviews and approval by the fire department with "FIR" permits issued, prior to any modification / installation work on fire sprinkler and alarms with this project. JWA*, NOTE: PARTIAL PERMIT ISSUED AT THE REQUEST OF THE CONTRACTOR ON 6/7/2000-SEE CONDITION STATEMENT ATTACHED TO THIS PERMIT.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Conference11/30/201111/30/201111/30/2011PDONE
DetailsScott Arellano
The existing switch gear room has been vacated and all electrical equipment and stationary storage batteries have been removed by the tenant. The clean agent fire protection and detection system has been removed under FIR11-00528. The existing rated wall assembly seperating the former switch gear room and the mechanical room has been modified and no longer maintains an approved 1 hour rated assembly. The opening protection seperating the switch gear room and the mechanical room, (smoke dampers), may have been impared due the removal of the area smoke detection required as part of the clean agent system removal. The mechanical division, building official, and fire code official have approved the 3 air handling units to remain as is, under the condition the space served by the air handling units remains unoccupied. An occupancy permit shall be obtained prior to untilization of the vacated switch gear space.
BLD-Final1/19/20011/19/20011/19/2001PPASS
DetailsJim Storey
###-####
BLD-Final1/19/20011/19/20011/19/2001PPASS
DetailsJim Storey
###-####
FIRE-Final Inspection1/19/20011/19/20011/19/2001PPASS
DetailsRick Jackson
Added by Inspector: 409 On 1/19/2001 2:40:09 PM
Permanent Occupancy 1/19/20011/19/2001 DONE
Details
BLD-Final12/1/200012/4/200012/4/2000APART
DetailsJim Storey
Craig ###-#### temp occ pending ele sign off. 12/4/2000 8:11:31 AM
BLD-Final12/1/200012/1/200012/1/2000PPART
DetailsJim Storey
Added by Inspector: 301 On 12/1/2000 4:12:03 PM temp ok pending ele perm sign off.
BLD-Other7/26/20007/27/20007/27/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 07/26/2000 at 10:51:40. Contact: .--ceiling grid insp need permiter wires in la 7/27/2000 4:40:29 PMb and tee struts at pods. 7/27/2000 4:41:01 PM
BLD-Framing/Rough-in7/7/20007/10/20007/10/2000APART
DetailsJim Storey
Craig ###-#### sheer ok 7/10/00 10:38:17 AM
BLD-Framing/Rough-in7/6/20007/7/20007/7/2000APART
Details
Craig ###-#### okt o cover north shear wall; eng on sith per c/n 6/30/2k; need screw placement insp on the hea 7/7/00 12:29:15 PM shear wall 7/7/00 12:29:31 PM
BLD-Framing/Rough-in6/29/20006/29/20006/29/2000PFAIL
DetailsJim Storey
craig ###-####