BLD-Final | 8/14/2002 | 8/14/2002 | 8/14/2002 | P | PASS |
Tony Young
|
|
|
|
Permanent Occupancy | | 8/14/2002 | 8/14/2002 | | DONE |
|
|
|
|
Permanent Occupancy | | 8/14/2002 | 8/14/2002 | | DONE |
|
|
|
|
BLD-Final | 11/27/2001 | 11/27/2001 | 11/27/2001 | P | PART |
Tony Young
|
|
|
###-####
temp. occ. signed 11/27/2001 2:02:18 PM
|
FIRE-Final Inspection | 11/20/2001 | 11/21/2001 | 11/21/2001 | A | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 11/20/2001 at 16:07:11. Contact: ###-####.
|
BLD-Energy code compliance | 2/28/2001 | 3/1/2001 | 3/1/2001 | P | PASS |
Tony Young
|
|
|
|
BLD-Framing/Rough-in | 3/1/2001 | 3/1/2001 | 3/1/2001 | P | PASS |
Tony Young
|
|
|
Scheduled by Inspector: 415 On 3/1/2001 10:49:54 AM
|
BLD-Framing/Rough-in | 2/28/2001 | 3/1/2001 | 3/1/2001 | A | FAIL |
Tony Young
|
|
|
c/n still governs 3/1/2001 10:54:18 AM
|
BLD-Framing/Rough-in | 2/22/2001 | 2/22/2001 | 2/22/2001 | P | PART |
Tony Young
|
|
|
chris ###-####
c/n posted, ok to insulate unaffected areas 2/22/2001 1:03:45 PM
|
BLD-Framing/Rough-in | 2/14/2001 | 2/15/2001 | 2/15/2001 | A | PART |
Tony Young
|
|
|
need to see 1 hr assembly on main floor b4 insulation, ok to insulate upper, verify previous and paint marks 2/15/2001 12:02:22 PM
|
BLD-Framing/Rough-in | 2/12/2001 | 2/12/2001 | 2/12/2001 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 02/12/2001 at 06:38:45. Contact: ###-####.
ext. shear ok 2/12/2001 2:49:12 PM
|
BLD-Framing/Rough-in | 2/12/2001 | 2/12/2001 | 2/12/2001 | P | PART |
Tony Young
|
|
|
conf. only., need trades signed off, finish fire and draft stopping 2/12/2001 2:58:05 PM
|
BLD-Framing/Rough-in | 10/5/2000 | 10/5/2000 | 10/5/2000 | P | NR |
Jim Storey
|
|
|
###-####
|
BLD-Footing | 9/18/2000 | 9/19/2000 | 9/19/2000 | A | PART |
|
|
|
CHRIS -- ###-#### -FT INSP pending eng paperwork 9/19/2000 1:25:02 PM
|