BLD-Final | 11/21/2000 | 11/22/2000 | 11/22/2000 | P | PASS |
Jim Storey
|
|
|
###-####
|
BLD-Framing/Rough-in | 8/15/2000 | 8/16/2000 | 8/16/2000 | A | PASS |
|
|
|
Harland ###-#### ok by 301 8/16/00 11:20:12 AM
|
BLD-Framing/Rough-in | 8/14/2000 | 8/14/2000 | 8/14/2000 | P | FAIL |
Jim Storey
|
|
|
Harland ###-#### cell ###-#### c/n posted ok to insulate truss info must be corrected as noted. 8/14/2000 9:49:11 AM
|
BLD-Framing/Rough-in | 8/11/2000 | 8/11/2000 | 8/11/2000 | P | CANC |
|
|
|
Scheduled by a contractor via Hello! on 08/11/2000 at 09:39:40. Contact: . out of time will be done by 301 8/14/2000 8:21:48 AM
|
BLD-Concrete | 7/13/2000 | 7/14/2000 | 7/14/2000 | P | PASS |
Jim Storey
|
|
|
matt-- ###-#### stem wall
|