FIRE-Final Inspection | 7/31/2001 | 7/31/2001 | 7/31/2001 | A | PASS |
Rick Jackson
|
|
|
Added by Inspector: 409 On 7/31/2001 9:58:38 AM
|
BLD-Framing/Rough-in | 11/6/2000 | 11/6/2000 | 11/6/2000 | P | PASS |
Steven Webb
|
|
|
###-####
|
FIRE-Conference | 10/24/2000 | 10/26/2000 | 10/26/2000 | A | PART |
Rick Jackson
|
|
|
Bob, ###-#### reviewed alarm plans with electrical contractor - they will resubmit on battery calcs due to system on generator; will determine if the elevator is capable of recall and shunt and submit to plan review 10/26/2000 12:04:20 PM
|
BLD-Conference | 10/20/2000 | 10/23/2000 | 10/23/2000 | A | CANC |
Jim Storey
|
|
|
Bob, ###-####
|
FIRE-Conference | 10/20/2000 | 10/23/2000 | 10/23/2000 | A | PART |
Rick Jackson
|
|
|
Bob, ###-#### damper locations in lobby and at floor ceiling penetrations 10/23/2000 10:53:00 AM
|
FIRE-Sprinkler Rough-in | 9/18/2000 | 9/18/2000 | 9/18/2000 | A | PART |
Rick Jackson
|
|
|
Scheduled by Inspector: 409 On 9/18/2000 okay to cover HR area only
|
FIRE-Final Inspection | 9/14/2000 | 9/15/2000 | 9/18/2000 | A | FAIL |
Rick Jackson
|
|
|
BOB---FIRE FN --###-#### not a final inspection - sprinkler r/i only - okay to cover HR area 9/18/2000 9:32:37 AM
|
BLD-Final | 9/14/2000 | 9/15/2000 | 9/15/2000 | A | CANC |
Jim Storey
|
|
|
FN OCC-- BOB ###-####
|
BLD-Framing/Rough-in | 8/21/2000 | 8/21/2000 | 8/21/2000 | P | PASS |
Jim Storey
|
|
|
###-#### check corrador at final for fire stopping. 8/21/2000 2:38:48 PM
|
FIRE-Sprinkler Rough-in | 7/26/2000 | 7/27/2000 | 7/27/2000 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 07/26/2000 at 08:57:53. Contact: .....okay to cover corporate secretary office area only 7/27/2000 10:21:53 AM
|
BLD-Framing/Rough-in | 7/24/2000 | 7/25/2000 | 7/25/2000 | A | PASS |
Jim Storey
|
|
|
Bob, ###-####
|
BLD-Framing/Rough-in | 11/9/2000 | 11/9/2000 | 3/9/2000 | P | PART |
Jim Storey
|
|
|
###-####partion walls ok for cover. 11/10/2000 9:24:04 AM
|