BLD-Final | 1/5/2001 | 1/9/2001 | 1/9/2001 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 01/05/2001 at 10:48:54. Contact: ###-####.
|
FIRE-Final Inspection | 1/5/2001 | 1/8/2001 | 1/8/2001 | P | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 01/05/2001 at 10:24:14. Contact: ###-####.
|
FIRE-Final Inspection | 12/28/2000 | 12/28/2000 | 12/28/2000 | P | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 12/28/2000 at 10:53:20. Contact: ###-####./// east door not openable from the inside with mag lock on 12/28/2000 1:29:47 PM
|
BLD-Conference | 12/14/2000 | 12/14/2000 | 12/14/2000 | P | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 12/14/2000 at 10:07:44. Contact: ###-####. 12/14/2000 3:36:14 PM
|
BLD-Framing/Rough-in | 11/21/2000 | 11/22/2000 | 11/22/2000 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 11/21/2000 at 13:09:00. Contact: ###-####.: ok to cover, ok for existing rebar to be used for electrical ground. 11/22/2000 11:54:47 AM: submittals provided. 11/22/2000 11:55:21 AM
|
BLD-Framing/Rough-in | 11/20/2000 | 11/21/2000 | 11/21/2000 | P | CANC |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 11/20/2000 at 11:56:47. Contact: ###-####.cancel by cont. 11/21/2000 12:51:39 PM
|
BLD-Footing | 11/17/2000 | 11/20/2000 | 11/20/2000 | A | PART |
Steven Webb
|
|
|
Derick ###-####: Already poured footings, stem wall and CMU. Special inspection records on site, need framing prior to cover after mechanical, elec. and plumbing completed. 11/20/2000 12:01:56 PM
|