BLD-Final | 12/4/2000 | 12/5/2000 | 12/5/2000 | A | PASS |
Alan Hauser
|
|
|
c/c#19847 12/6/2000 8:43:35 AM
|
BLD-Grading Inspection | 12/5/2000 | 12/5/2000 | 12/5/2000 | | PASS |
Rita DeYoung
|
|
|
Final grading approved.
|
FIRE-Final Inspection | 12/5/2000 | 12/5/2000 | 12/5/2000 | A | PASS |
Rick Jackson
|
|
|
Scheduled by Inspector: 409 On 12/5/2000 8:49:02 AM
|
BLD-Final | 12/1/2000 | 12/4/2000 | 12/4/2000 | P | NR |
Tony Young
|
|
|
###-####
|
BLD-Framing/Rough-in | 9/14/2000 | 9/15/2000 | 9/15/2000 | A | PASS |
Tony Young
|
|
|
J Bar k ###-####
interior shear wall inspection 9/15/2000 8:56:17 AM
|
BLD-Framing/Rough-in | 9/11/2000 | 9/12/2000 | 9/12/2000 | A | CANC |
|
|
|
Scheduled by Inspector: 415 On 9/11/2000 done by 415 9/12/2000 10:49:12 AM
|
BLD-Energy code compliance | 9/12/2000 | 9/11/2000 | 9/11/2000 | P | PASS |
Tony Young
|
|
|
Scheduled by Inspector: 415 On 9/12/2000
|
BLD-Framing/Rough-in | 9/7/2000 | 9/8/2000 | 9/8/2000 | P | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 09/07/2000 at 15:10:40. Contact: ###-####.
|
BLD-Framing/Rough-in | 9/6/2000 | 9/7/2000 | 9/7/2000 | P | NR |
Tony Young
|
|
|
GARY --###-#### FR
|
BLD-Framing/Rough-in | 9/5/2000 | 9/6/2000 | 9/6/2000 | A | PART |
Tony Young
|
|
|
Gary ###-####
ok to insulate,, c/n posted on truss specs, bracing 9/6/2000 11:42:20 AM
|
BLD-Framing/Rough-in | 8/29/2000 | 8/31/2000 | 8/31/2000 | A | FAIL |
Carl Dependahl
|
|
|
GARY-- ###-#### FR; c/n, not ready, air seal other r/i (fire sprinkler, f.p.) 8/31/2000 11:08:25 AM
|
FIRE-Sprinkler Rough-in | 8/30/2000 | 8/31/2000 | 8/31/2000 | P | PASS |
Rick Jackson
|
|
|
Karen ###-#### reinspection okay to cover under FIR00-00394 8/31/2000 4:21:10 PM
|
FIRE-Sprinkler Rough-in | 8/28/2000 | 8/29/2000 | 8/30/2000 | A | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 08/28/2000 at 11:57:35. Contact: ###-####. tenting required prior to cover 8/30/2000 11:11:40 AM
|
BLD-Framing/Rough-in | 8/28/2000 | 8/29/2000 | 8/29/2000 | A | NR |
Tony Young
|
|
|
###-####--GARY FR INSP
call for reinspect after trades get rouph inspections 8/29/2000 11:34:54 AM
|
BLD-Framing/Rough-in | 8/21/2000 | 8/22/2000 | 8/22/2000 | A | PART |
Tony Young
|
|
|
###-####
shear nail ok 8/22/2000 10:16:03 AM
|
BLD-Conference | 7/28/2000 | 7/31/2000 | 7/31/2000 | A | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 07/28/2000 at 16:10:15. Contact: ###-####. Conference on straps & point loads 7/31/00 12:11:05 PM
|
BLD-Foundation | 7/14/2000 | 7/17/2000 | 7/17/2000 | A | PART |
Tony Young
|
|
|
###-#### found. wall Looks ok work in progress 7/18/00 2:06:16 PM
|
BLD-Foundation | 7/14/2000 | 7/14/2000 | 7/14/2000 | P | CANC |
Tony Young
|
|
|
###-#### late pm Not ready 7/18/00 1:23:52 PM
|
BLD-Foundation | 7/12/2000 | 7/13/2000 | 7/13/2000 | A | PART |
Tony Young
|
|
|
###-#### Ok for plan 7/13/00 1:40:39 PM
|
BLD-Footing | 7/12/2000 | 7/12/2000 | 7/12/2000 | P | FAIL |
Tony Young
|
|
|
clyde ###-#### ft Depth not to plan 7/13/00 1:34:07 PM
|