FIRE-Final Inspection | 3/12/2002 | 3/12/2002 | 3/12/2002 | P | PASS |
Rick Jackson
|
|
|
I show the sprinkler permit finaled but not life safety.
|
BLD-Final | 3/11/2002 | 3/11/2002 | 3/11/2002 | P | PASS |
Jim Storey
|
|
|
Added by Inspector: 301 On 3/11/2002 3:02:55 PM final ok
|
BLD-Wall cover | 12/10/2001 | 12/12/2001 | 12/12/2001 | A | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/10/2001 at 16:31:25. Contact: ###-####. pod wires and primitor wires/ fire stop. 12/12/2001 4:33:55 PM
|
BLD-Wall cover | 11/30/2001 | 12/3/2001 | 12/3/2001 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/30/2001 at 14:52:14. Contact: ###-####.
|
BLD-Final | 11/10/2001 | 11/10/2001 | 11/10/2001 | A | PART |
Jim Storey
|
|
|
Scheduled by Inspector: 301 On 11/10/2001 8:30:10 AM temp final ok pending other trades sign off. ie plm. 11/10/2001 10:14:03 AM
|
FIRE-Final Inspection | 11/13/2001 | 11/10/2001 | 11/10/2001 | A | PART |
Rick Jackson
|
|
|
Added by Inspector: 409 On 11/13/2001 7:18:40 AM bldg 24D only okay to occupy
|
FIRE-Conference | 6/26/2001 | 6/27/2001 | 6/27/2001 | P | CANC |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 06/26/2001 at 11:32:50. Contact: ###-####. request made by mistake 6/27/2001 2:43:07 PM
|
BLD-Concrete | 6/21/2001 | 6/25/2001 | 6/25/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 06/21/2001 at 07:51:10. Contact: ###-####. slab pending report. 6/25/2001 3:55:06 PM
|
BLD-Concrete | 6/12/2001 | 6/12/2001 | 6/12/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 06/12/2001 at 10:34:48. Contact: ###-####. placed with specia 6/13/2001 10:07:58 AMl insp. pending report. 6/13/2001 10:08:36 AM
|
BLD-Concrete | 5/29/2001 | 5/29/2001 | 5/29/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 05/29/2001 at 07:07:34. Contact: ###-####.
|
BLD-Wall cover | 5/23/2001 | 5/23/2001 | 5/23/2001 | A | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 05/23/2001 at 07:17:07. Contact: ###-####. c/n posted. 5/23/2001 12:30:28 PM
|
BLD-Concrete | 5/18/2001 | 5/18/2001 | 5/18/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 05/18/2001 at 06:55:23. Contact: ###-####. placed with special insp. pending report. 5/18/2001 2:27:49 PM
|
BLD-Concrete | 5/3/2001 | 5/3/2001 | 5/3/2001 | P | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 05/03/2001 at 08:52:38. Contact: ###-####. Grid line 35 stem wall--north end, ok. 5/3/2001 3:11:08 PM
|
BLD-Concrete | 4/30/2001 | 4/30/2001 | 4/30/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 04/30/2001 at 07:11:53. Contact: ###-####. placed with special insp. pending report. 4/30/2001 2:21:45 PM
|
BLD-Concrete | 4/26/2001 | 4/27/2001 | 4/27/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 04/26/2001 at 07:27:56. Contact: ###-####. placed with special insp pending report. 4/27/2001 1:28:42 PM
|
BLD-Concrete | 4/23/2001 | 4/26/2001 | 4/26/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 04/23/2001 at 12:02:35. Contact: ###-####. placed with specia 4/26/2001 4:08:14 PMl insp. pending r 4/26/2001 4:08:26 PM e 4/26/2001 4:08:26 PMport. 4/26/2001 4:08:38 PM
|
BLD-Concrete | 4/23/2001 | 4/25/2001 | 4/25/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 04/23/2001 at 12:01:31. Contact: ###-####. placed with special insp.pending report. 4/25/2001 4:58:43 PM
|
BLD-Concrete | 4/23/2001 | 4/24/2001 | 4/24/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 04/23/2001 at 12:02:04. Contact: ###-####. placed with special insp. pending report. 4/24/2001 4:40:28 PM
|
BLD-Concrete | 4/19/2001 | 4/19/2001 | 4/19/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 04/19/2001 at 07:30:09. Contact: ###-####. placed wth special insp.pending report. 4/19/2001 3:02:32 PM
|
BLD-Concrete | 4/16/2001 | 4/16/2001 | 4/16/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 04/16/2001 at 07:34:31. Contact: ###-####. wip 4/16/2001 6:30:31 PM
|
BLD-Concrete | 4/13/2001 | 4/13/2001 | 4/13/2001 | P | NR |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 04/13/2001 at 05:47:09. Contact: ###-####.
|
BLD-Concrete | 4/9/2001 | 4/11/2001 | 4/11/2001 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 04/09/2001 at 05:52:47. Contact: ###-####.
|
BLD-Concrete | 4/9/2001 | 4/10/2001 | 4/10/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 04/09/2001 at 05:52:18. Contact: ###-####. placed with special insp. pending report. 4/10/2001 2:44:15 PM
|
BLD-Concrete | 4/9/2001 | 4/9/2001 | 4/9/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 04/09/2001 at 05:51:50. Contact: ###-####. placed with special insp. pending report. 4/9/2001 4:29:25 PM
|
BLD-Concrete | 4/5/2001 | 4/6/2001 | 4/6/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 04/05/2001 at 06:38:24. Contact: ###-####.
|
BLD-Concrete | 4/5/2001 | 4/5/2001 | 4/5/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 04/05/2001 at 06:37:58. Contact: ###-####. placed with special insp . pending report. 4/5/2001 3:29:24 PM
|
BLD-Concrete | 4/2/2001 | 4/4/2001 | 4/4/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 04/02/2001 at 06:34:42. Contact: ###-####.
|
BLD-Concrete | 4/2/2001 | 4/3/2001 | 4/3/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 04/02/2001 at 06:34:11. Contact: ###-####.
|
BLD-Concrete | 4/2/2001 | 4/2/2001 | 4/2/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 04/02/2001 at 06:33:42. Contact: ###-####. placed with special insp. pending report. 4/2/2001 2:03:37 PM
|
BLD-Concrete | 3/30/2001 | 3/30/2001 | 3/30/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 03/30/2001 at 05:36:46. Contact: ###-####. placed with special insp. pending report. 3/30/2001 12:09:55 PM
|
BLD-Conference | 3/30/2001 | 3/30/2001 | 3/30/2001 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 03/30/2001 at 05:34:56. Contact: ###-####. engineer of record to detirmon ele steel primary or secondary. 3/30/2001 12:09:19 PM
|
BLD-Concrete | 3/26/2001 | 3/28/2001 | 3/28/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 03/26/2001 at 08:21:40. Contact: ###-####. placed w/special insp.pending report. 3/28/2001 2:08:30 PM
|
BLD-Concrete | 3/26/2001 | 3/27/2001 | 3/27/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 03/26/2001 at 08:21:08. Contact: ###-####. placed with special insp.pending report. 3/28/2001 9:52:34 AM
|
BLD-Concrete | 3/26/2001 | 3/26/2001 | 3/26/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 03/26/2001 at 08:20:37. Contact: ###-####. placed with special insp pending report. 3/26/2001 3:33:21 PM
|
BLD-Concrete | 3/22/2001 | 3/23/2001 | 3/23/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 03/22/2001 at 08:12:37. Contact: ###-####. placed with special insp. pending report. 3/23/2001 2:21:01 PM
|
BLD-Concrete | 3/22/2001 | 3/22/2001 | 3/22/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 03/22/2001 at 08:12:08. Contact: ###-####. placed with special insp. pending report. 3/22/2001 4:10:40 PM
|
BLD-Concrete | 3/19/2001 | 3/21/2001 | 3/21/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 03/19/2001 at 07:16:33. Contact: ###-####. placed with special insp. 3/21/2001 5:24:32 PM
|
BLD-Concrete | 3/19/2001 | 3/20/2001 | 3/20/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 03/19/2001 at 07:16:12. Contact: ###-####.
|
BLD-Concrete | 3/19/2001 | 3/19/2001 | 3/19/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 03/19/2001 at 07:15:44. Contact: ###-####. placed with spoecial insp.pending report. 3/19/2001 1:46:40 PM
|
BLD-Concrete | 3/16/2001 | 3/16/2001 | 3/16/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 03/16/2001 at 06:26:59. Contact: ###-####. placed 3/16/2001 2:24:18 PM
|
BLD-Concrete | 3/13/2001 | 3/15/2001 | 3/15/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 03/13/2001 at 05:51:06. Contact: ###-####. placed with special insp. pending report. 3/15/2001 4:38:23 PM
|
BLD-Concrete | 3/13/2001 | 3/14/2001 | 3/14/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 03/13/2001 at 05:49:44. Contact: ###-####. covered with special insp.pending report. 3/14/2001 4:39:38 PM
|
BLD-Concrete | 3/13/2001 | 3/13/2001 | 3/13/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 03/13/2001 at 05:49:05. Contact: ###-####. placed with special insp.pending report. 3/13/2001 12:59:10 PM
|
BLD-Concrete | 3/6/2001 | 3/8/2001 | 3/8/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 03/06/2001 at 05:45:47. Contact: ###-####. placed with special insp. pending report. 3/8/2001 5:05:58 PM
|
BLD-Concrete | 3/6/2001 | 3/7/2001 | 3/7/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 03/06/2001 at 05:45:20. Contact: ###-####. PLACED WITH SPECIAL INSP PENDING REPORTS. 3/7/2001 5:35:02 PM
|
BLD-Concrete | 3/6/2001 | 3/6/2001 | 3/6/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 03/06/2001 at 05:44:50. Contact: ###-####. PLACED WITH SPECIALL INSP PENDING REPORTS 3/7/2001 5:34:23 PM
|
BLD-Concrete | 2/28/2001 | 3/2/2001 | 3/2/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 02/28/2001 at 05:42:34. Contact: ###-####. placed with special insp. pending report. 3/2/2001 3:18:21 PM
|
BLD-Concrete | 2/28/2001 | 3/1/2001 | 3/1/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 02/28/2001 at 05:42:01. Contact: ###-####. covered with special insp. pending report. 3/1/2001 1:54:35 PM
|
BLD-Concrete | 2/28/2001 | 2/28/2001 | 2/28/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 02/28/2001 at 05:41:23. Contact: ###-####. placed with special insp.pending report. 2/28/2001 3:41:54 PM
|
BLD-Concrete | 2/19/2001 | 2/22/2001 | 2/22/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 02/19/2001 at 07:09:24. Contact: ###-####. placed with special insp. pending report. 2/23/2001 10:52:15 AM
|
BLD-Concrete | 2/19/2001 | 2/21/2001 | 2/21/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 02/19/2001 at 07:08:55. Contact: ###-####. covered with special insp. pending report. 2/21/2001 12:24:40 PM
|
BLD-Concrete | 2/19/2001 | 2/20/2001 | 2/20/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 02/19/2001 at 07:08:25. Contact: ###-####. placed with special insp. 2/20/2001 3:34:50 PM
|
BLD-Concrete | 2/15/2001 | 2/16/2001 | 2/16/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 02/15/2001 at 06:03:06. Contact: ###-####. placed with special insp. pending report. 2/20/2001 9:03:16 AM
|
BLD-Concrete | 2/15/2001 | 2/15/2001 | 2/15/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 02/15/2001 at 06:02:29. Contact: ###-####. placed with special insp. pending report. 2/15/2001 2:49:40 PM
|
BLD-Concrete | 2/12/2001 | 2/14/2001 | 2/14/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 02/12/2001 at 07:20:06. Contact: ###-####. placed with special insp. pending report. 2/14/2001 2:57:11 PM
|
BLD-Concrete | 2/12/2001 | 2/13/2001 | 2/13/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 02/12/2001 at 07:19:40. Contact: ###-####. placed with special insp. pending report. 2/13/2001 2:03:02 PM
|
BLD-Concrete | 2/12/2001 | 2/13/2001 | 2/13/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 02/12/2001 at 07:19:40. Contact: ###-####. placed with special insp. pending report. 2/13/2001 2:03:02 PM
|
BLD-Concrete | 2/12/2001 | 2/12/2001 | 2/12/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 02/12/2001 at 07:19:10. Contact: ###-####. placed with 2/12/2001 1:09:40 PM
|
BLD-Concrete | 2/7/2001 | 2/9/2001 | 2/9/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 02/07/2001 at 06:41:13. Contact: ###-####. placed with special insp. pending report. 2/11/2001 9:21:33 PM
|
BLD-Concrete | 2/7/2001 | 2/8/2001 | 2/8/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 02/07/2001 at 06:40:40. Contact: ###-####. placed with special insp. pending report. 2/8/2001 2:40:06 PM
|
BLD-Concrete | 2/5/2001 | 2/7/2001 | 2/7/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 02/05/2001 at 06:45:14. Contact: ###-####. placed with special insp. pending report. 2/7/2001 3:53:03 PM
|
BLD-Concrete | 2/5/2001 | 2/6/2001 | 2/6/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 02/05/2001 at 06:44:46. Contact: ###-####. placed with special insp. pending report. 2/6/2001 4:57:15 PM
|
BLD-Concrete | 2/5/2001 | 2/5/2001 | 2/5/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 02/05/2001 at 06:44:16. Contact: ###-####. Scheduled by a placed with special insp. pending report.contractor via Hello! on 02/05/2001 at 06:44:16. Contact: ###-####. 2/5/2001 6:11:39 PM
|
BLD-Wall cover | 2/2/2001 | 2/5/2001 | 2/5/2001 | A | NR |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 02/02/2001 at 06:49:54. Contact: ###-####.
|
BLD-Concrete | 2/1/2001 | 2/2/2001 | 2/2/2001 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 02/01/2001 at 08:02:46. Contact: ###-####. pending insp report. 2/2/2001 2:10:10 PM
|
BLD-Concrete | 2/1/2001 | 2/1/2001 | 2/1/2001 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 02/01/2001 at 08:02:17. Contact: ###-####....pend report 2/1/2001 2:56:01 PM
|
BLD-Concrete | 1/29/2001 | 1/31/2001 | 1/31/2001 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 01/29/2001 at 06:35:40. Contact: ###-####. pend spec insp report. 1/31/2001 12:40:52 PM
|
BLD-Concrete | 1/29/2001 | 1/30/2001 | 1/30/2001 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 01/29/2001 at 06:35:07. Contact: ###-####... pending spec. insp report 1/30/2001 1:54:47 PM
|
BLD-Concrete | 1/29/2001 | 1/29/2001 | 1/29/2001 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 01/29/2001 at 06:34:31. Contact: ###-####. pend spec insp report 1/29/2001 9:47:02 AM
|
BLD-Concrete | 1/24/2001 | 1/25/2001 | 1/25/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 01/24/2001 at 14:22:07. Contact: ###-####. placed with special insp. pending report. 1/25/2001 5:52:12 PM
|
BLD-Framing/Rough-in | 1/25/2001 | 1/25/2001 | 1/25/2001 | A | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 01/25/2001 at 05:55:06. Contact: ###-####. basement h-3 occ need to review plan in furthere detial as to chem exsust duct and tunnel coridor wall ref. 1/25/2001 5:51:41 PM
|
BLD-Concrete | 1/22/2001 | 1/24/2001 | 1/24/2001 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 01/22/2001 at 05:21:10. Contact: ###-####. work in progess. 1/24/2001 5:34:06 PM
|
BLD-Concrete | 1/22/2001 | 1/23/2001 | 1/23/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 01/22/2001 at 05:20:38. Contact: ###-####. placed with special insp. pending report. 1/23/2001 2:12:47 PM
|
BLD-Concrete | 1/22/2001 | 1/23/2001 | 1/23/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 01/22/2001 at 05:20:38. Contact: ###-####. placed with special insp. pending report. 1/23/2001 2:12:47 PM
|
BLD-Concrete | 1/22/2001 | 1/22/2001 | 1/22/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 01/22/2001 at 05:20:08. Contact: ###-####. placed w/s/p/i pending report. 1/22/2001 4:37:35 PM
|
BLD-Concrete | 1/19/2001 | 1/19/2001 | 1/19/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 01/19/2001 at 05:40:09. Contact: ###-####. placed with special insp. pending report. 1/19/2001 2:20:05 PM
|
BLD-Concrete | 1/19/2001 | 1/19/2001 | 1/19/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 01/19/2001 at 05:40:09. Contact: ###-####. placed with special insp. pending report. 1/19/2001 2:20:05 PM
|
BLD-Concrete | 1/15/2001 | 1/18/2001 | 1/18/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 01/15/2001 at 07:15:22. Contact: ###-####. placed with special insp. pending report. 1/18/2001 4:14:59 PM
|
BLD-Concrete | 1/15/2001 | 1/17/2001 | 1/17/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 01/15/2001 at 07:14:41. Contact: ###-####.
|
BLD-Concrete | 1/15/2001 | 1/16/2001 | 1/16/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 01/15/2001 at 07:13:57. Contact: ###-####. placed with special insp. pending report. 1/17/2001 9:48:39 AM
|
BLD-Concrete | 1/10/2001 | 1/12/2001 | 1/12/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 01/10/2001 at 07:22:25. Contact: ###-####.placed with special insp. pending report. 1/12/2001 2:06:42 PM
|
BLD-Concrete | 1/10/2001 | 1/11/2001 | 1/11/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 01/10/2001 at 07:21:55. Contact: ###-####. placed with special insp. pending report. 1/11/2001 3:18:54 PM
|
BLD-Concrete | 1/8/2001 | 1/10/2001 | 1/10/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 01/08/2001 at 07:07:21. Contact: ###-####. placed with special insp. pending report. 1/9/2001 1:28:43 PM
|
BLD-Concrete | 1/8/2001 | 1/9/2001 | 1/9/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 01/08/2001 at 07:06:53. Contact: ###-####. placed with special insp. pending report. 1/9/2001 1:28:20 PM
|
BLD-Concrete | 1/8/2001 | 1/8/2001 | 1/8/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 01/08/2001 at 07:06:20. Contact: ###-####.placed with special insp. pending report. 1/8/2001 4:28:23 PM
|
BLD-Concrete | 1/2/2001 | 1/4/2001 | 1/4/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 01/02/2001 at 07:04:42. Contact: ###-####. waffel deck placement north west sec. pending report from special insp. c/n for welds performed on wall plates painted and not removed before welding I beams for pipe racking in basement. Grout not placed for 2 nd floor east wall work in progess will re insp 1/5/2001/ 1/4/2001 4:31:12 PM 1/4/2001 4:32:41 PM
|
BLD-Concrete | 1/2/2001 | 1/4/2001 | 1/4/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 01/02/2001 at 07:04:42. Contact: ###-####. waffel deck placement north west sec. pending report from special insp. c/n for welds performed on wall plates painted and not removed before welding I beams for pipe racking in basement. Grout not placed for 2 nd floor east wall work in progess will re insp 1/5/2001/ 1/4/2001 4:31:12 PM 1/4/2001 4:32:41 PM
|
BLD-Concrete | 1/2/2001 | 1/3/2001 | 1/3/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 01/02/2001 at 07:04:13. Contact: ###-####. placed with special insp. pending report. 1/3/2001 5:00:16 PM
|
BLD-Concrete | 1/2/2001 | 1/2/2001 | 1/2/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 01/02/2001 at 07:03:37. Contact: ###-####. placed with special insp.pending report. 1/2/2001 3:23:29 PM
|
BLD-Concrete | 12/29/2000 | 12/29/2000 | 12/29/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/29/2000 at 06:52:37. Contact: ###-####. placed with special insp. pending report. 12/29/2000 5:00:18 PM
|
BLD-Concrete | 12/26/2000 | 12/28/2000 | 12/28/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/26/2000 at 07:05:23. Contact: ###-####. #1 peir at north end of tressill rock drilling in progess for ft stablition and soil pinning. 12/27/2000 3:29:33 PM
|
BLD-Concrete | 12/26/2000 | 12/27/2000 | 12/27/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/26/2000 at 07:04:43. Contact: ###-####. tressel steel fram on site from fabracator bolting and weld conection in progess as well as piping supports to first truss. work in progess. 12/27/2000 3:27:22 PM
|
BLD-Foundation | 11/27/2000 | 12/27/2000 | 12/27/2000 | A | PART |
Jim Storey
|
|
|
joe ###-#### found- tressel work in progess covered with special insp. 12/27/2000 10:59:58 AM
|
BLD-Concrete | 12/26/2000 | 12/26/2000 | 12/26/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/26/2000 at 07:04:03. Contact: ###-####. placed with special insp. pending report. 12/26/2000 4:16:58 PM
|
BLD-Concrete | 12/20/2000 | 12/22/2000 | 12/22/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/20/2000 at 07:12:56. Contact: ###-####. placed with special insp. 12/21/2000 2:31:55 PM
|
BLD-Concrete | 12/20/2000 | 12/21/2000 | 12/21/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/20/2000 at 07:12:27. Contact: ###-####. placed with special insp. report to reflect hook bar change form engineer of record. 12/21/2000 4:12:14 PM
|
BLD-Concrete | 12/18/2000 | 12/20/2000 | 12/20/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/18/2000 at 07:27:37. Contact: ###-####. placed with special insp. pending report. 12/20/2000 10:17:33 PM need engineering for peir 1# pipe under footting. 12/20/2000 10:18:53 PM
|
BLD-Foundation | 11/27/2000 | 12/20/2000 | 12/20/2000 | A | PART |
Jim Storey
|
|
|
found -tressel joe ###-#### need engineering to justafy #1 peir footing configuration w/ pipe under footting. 12/20/2000 2:03:03 PM
|
BLD-Concrete | 12/18/2000 | 12/19/2000 | 12/19/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/18/2000 at 07:27:04. Contact: ###-####. placed with special insp. pending report. 12/19/2000 3:10:00 PM 12/19/2000 3:10:11 PM
|
BLD-Concrete | 12/18/2000 | 12/18/2000 | 12/18/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/18/2000 at 07:26:24. Contact: ###-####. placed with special insp. pending report. 12/19/2000 9:03:48 AM
|
BLD-Concrete | 12/14/2000 | 12/15/2000 | 12/15/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/14/2000 at 07:32:02. Contact: ###-####. placed with special insp. 12/15/2000 4:05:11 PM
|
BLD-Concrete | 12/14/2000 | 12/14/2000 | 12/14/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/14/2000 at 07:31:31. Contact: ###-####. placed with special insp. pending report. 12/14/2000 4:12:53 PM
|
BLD-Concrete | 12/11/2000 | 12/13/2000 | 12/13/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/11/2000 at 08:40:19. Contact: ###-####. placed with special insp. 12/13/2000 4:43:27 PM
|
BLD-Foundation | 11/27/2000 | 12/13/2000 | 12/13/2000 | A | PART |
Jim Storey
|
|
|
found -tressel joe ###-#### placed with special insp. pending report. 12/13/2000 9:16:52 AM
|
BLD-Concrete | 12/11/2000 | 12/12/2000 | 12/12/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/11/2000 at 08:39:45. Contact: ###-####. placed with special insp. pending report. 12/12/2000 4:55:52 PM
|
BLD-Concrete | 12/11/2000 | 12/11/2000 | 12/11/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/11/2000 at 08:39:13. Contact: ###-####. placed w/s/i pending report. 12/11/2000 2:37:10 PM
|
BLD-Concrete | 12/7/2000 | 12/8/2000 | 12/8/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/07/2000 at 15:08:37. Contact: ###-####. neeed plan change for deletion of #3 24 oc at bottom of waffel slab. 12/8/2000 3:34:08 PM
|
BLD-Concrete | 12/5/2000 | 12/7/2000 | 12/7/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/05/2000 at 07:24:33. Contact: ###-####. work in progess cancled for 12/8/2k. 12/7/2000 3:37:39 PM
|
BLD-Concrete | 12/5/2000 | 12/7/2000 | 12/7/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/05/2000 at 07:24:33. Contact: ###-####. work in progess cancled for 12/8/2k. 12/7/2000 3:37:39 PM
|
BLD-Concrete | 12/4/2000 | 12/6/2000 | 12/6/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/04/2000 at 08:46:30. Contact: ###-####. placed with special insp. 12/6/2000 2:18:42 PM
|
BLD-Foundation | 11/27/2000 | 12/6/2000 | 12/6/2000 | A | PART |
Jim Storey
|
|
|
found tressel--joe ###-#### placed with special insp. 12/6/2000 2:19:22 PM
|
BLD-Concrete | 12/4/2000 | 12/5/2000 | 12/5/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/04/2000 at 08:45:59. Contact: ###-####. work in progess c/w/s/i 12/5/2000 3:34:04 PM
|
BLD-Concrete | 12/4/2000 | 12/4/2000 | 12/4/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/04/2000 at 08:45:24. Contact: ###-####. placed with special insp. pending report. 12/4/2000 4:02:43 PM
|
BLD-Concrete | 11/29/2000 | 12/1/2000 | 12/1/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/29/2000 at 06:36:15. Contact: ###-####. placed with special insp. pending report. 12/1/2000 1:08:38 PM
|
BLD-Concrete | 11/29/2000 | 11/30/2000 | 11/30/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/29/2000 at 06:35:34. Contact: ###-####. placed with special insp pending report. 11/30/2000 5:15:24 PM
|
BLD-Concrete | 11/27/2000 | 11/29/2000 | 11/29/2000 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/27/2000 at 07:04:49. Contact: ###-####.
|
BLD-Foundation | 11/27/2000 | 11/29/2000 | 11/29/2000 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/27/2000 at 09:00:56. Contact: ###-####. p/w/s/i. walk through waffel slab beingstriped looks very good. 11/29/2000 12:52:06 PM
|
BLD-Foundation | 11/27/2000 | 11/29/2000 | 11/29/2000 | A | PART |
Jim Storey
|
|
|
joe-- ###-#### found--tressel.north cassion drilled pending s/i report. 11/29/2000 1:48:57 PM
|
BLD-Concrete | 11/27/2000 | 11/28/2000 | 11/28/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/27/2000 at 07:04:07. Contact: ###-####. p/w/s/i pending report. 11/28/2000 3:48:55 PM
|
BLD-Concrete | 11/27/2000 | 11/27/2000 | 11/27/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/27/2000 at 07:03:28. Contact: ###-####. placed with special insp. work in progess. 11/27/2000 3:56:41 PM
|
BLD-Concrete | 11/20/2000 | 11/24/2000 | 11/24/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/20/2000 at 18:38:33. Contact: ###-####. placed with special inspection pending report. 11/24/2000 1:05:27 PM
|
BLD-Concrete | 11/20/2000 | 11/21/2000 | 11/21/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/20/2000 at 18:37:36. Contact: ###-####. placed with special insp pending report. 11/21/2000 2:50:02 PM
|
BLD-Concrete | 11/16/2000 | 11/17/2000 | 11/17/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/16/2000 at 07:52:52. Contact: ###-####. placed w/s/i 11/17/2000 5:05:57 PM
|
BLD-Concrete | 11/16/2000 | 11/16/2000 | 11/16/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/16/2000 at 07:52:13. Contact: ###-####. placed with special inspection pending report. 11/16/2000 4:12:01 PM
|
BLD-Concrete | 11/13/2000 | 11/15/2000 | 11/15/2000 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 11/13/2000 at 09:19:21. Contact: ###-####. pend spec. insp. report 11/15/2000 4:01:48 PM
|
BLD-Concrete | 11/13/2000 | 11/14/2000 | 11/14/2000 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 11/13/2000 at 09:18:34. Contact: ###-####...pend report from spec. insp. agcy. 11/14/2000 10:51:08 AM
|
BLD-Concrete | 11/9/2000 | 11/13/2000 | 11/13/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/09/2000 at 15:43:41. Contact: ###-####. placed with special insp. pending report. 11/13/2000 9:30:57 PM
|
BLD-Concrete | 11/6/2000 | 11/8/2000 | 11/8/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/06/2000 at 07:59:05. Contact: ###-####. placed w s/i pending report 11/8/2000 4:23:57 PM
|
BLD-Concrete | 11/6/2000 | 11/7/2000 | 11/7/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/06/2000 at 07:58:12. Contact: ###-####. placed w/si p. report on site walk through and spoke w s/i ok having sch meeting. 11/7/2000 5:28:38 PM
|
BLD-Concrete | 11/6/2000 | 11/6/2000 | 11/6/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/06/2000 at 07:57:33. Contact: ###-####. placed w/special insp. pending report. 11/6/2000 4:20:17 PM
|
BLD-Concrete | 11/6/2000 | 11/6/2000 | 11/6/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/06/2000 at 07:57:33. Contact: ###-####. placed w/special insp. pending report. 11/6/2000 4:20:17 PM
|
BLD-Concrete | 11/1/2000 | 11/3/2000 | 11/3/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/01/2000 at 07:12:44. Contact: ###-####. placed with special insp. pending report. 11/3/2000 3:26:19 PM
|
BLD-Concrete | 11/1/2000 | 11/2/2000 | 11/2/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/01/2000 at 07:12:02. Contact: ###-####. placed with special ins 11/2/2000 3:27:22 PMp.pending report. 11/2/2000 3:27:32 PM
|
BLD-Concrete | 10/30/2000 | 11/1/2000 | 11/1/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/30/2000 at 09:10:49. Contact: ###-####. placed with special insp. pending report. 11/1/2000 4:12:30 PM
|
BLD-Concrete | 10/30/2000 | 10/31/2000 | 10/31/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/30/2000 at 09:09:58. Contact: ###-####. placed with special insp. pe nding report.10/31/2000 4:59:41 PM 10/31/2000 5:00:07 PM
|
BLD-Concrete | 10/30/2000 | 10/30/2000 | 10/30/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/30/2000 at 09:09:12. Contact: ###-####.
|
BLD-Concrete | 10/25/2000 | 10/27/2000 | 10/27/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/25/2000 at 09:25:52. Contact: ###-####. placed with special insp.pending report. 10/27/2000 3:17:39 PM
|
BLD-Concrete | 10/25/2000 | 10/26/2000 | 10/26/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/25/2000 at 09:25:09. Contact: ###-####. placed w/special insp. pending report. 10/26/2000 2:05:16 PM
|
BLD-Concrete | 10/23/2000 | 10/25/2000 | 10/25/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/23/2000 at 07:58:34. Contact: ###-####. placed w/special insp. pending report. 10/25/2000 4:09:43 PM
|
BLD-Concrete | 10/23/2000 | 10/24/2000 | 10/24/2000 | P | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/23/2000 at 07:57:51. Contact: ###-####.
|
BLD-Concrete | 10/23/2000 | 10/23/2000 | 10/23/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/23/2000 at 07:57:09. Contact: ###-####.
|
BLD-Concrete | 10/16/2000 | 10/20/2000 | 10/20/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/16/2000 at 15:19:51. Contact: ###-####. placed w/ special ins pending report. 10/20/2000 12:10:47 PM
|
BLD-Concrete | 10/16/2000 | 10/19/2000 | 10/19/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/16/2000 at 15:18:42. Contact: ###-####. pending report. 10/19/2000 5:05:24 PM
|
BLD-Concrete | 10/16/2000 | 10/18/2000 | 10/18/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/16/2000 at 15:17:56. Contact: ###-####. placed with special insp. pending 10/18/2000 3:14:33 PM report 10/18/2000 3:14:36 PM . 10/18/2000 3:14:40 PM
|
BLD-Concrete | 10/16/2000 | 10/17/2000 | 10/17/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/16/2000 at 15:17:17. Contact: ###-####.
|
BLD-Concrete | 10/11/2000 | 10/13/2000 | 10/13/2000 | P | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/11/2000 at 08:13:46. Contact: ###-####.
|
BLD-Concrete | 10/10/2000 | 10/12/2000 | 10/12/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/10/2000 at 07:24:54. Contact: ###-####. placed w/special insp. 10/12/2000 3:57:04 PM
|
BLD-Concrete | 10/10/2000 | 10/11/2000 | 10/11/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/10/2000 at 07:24:09. Contact: ###-####. placed w/special insp. pending report. 10/11/2000 4:20:25 PM
|
BLD-Concrete | 10/6/2000 | 10/10/2000 | 10/10/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/06/2000 at 07:00:01. Contact: ###-####. progess very good. pending reports for concrete strength. 10/10/2000 1:02:52 PM
|
BLD-Concrete | 10/6/2000 | 10/9/2000 | 10/9/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/06/2000 at 06:59:13. Contact: ###-####. placed with special insp. pending report. 10/9/2000 4:36:58 PM
|
BLD-Concrete | 10/4/2000 | 10/6/2000 | 10/6/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/04/2000 at 06:45:44. Contact: ###-####. placed with special insp. pending report. 10/6/2000 4:13:39 PM
|
BLD-Concrete | 10/4/2000 | 10/5/2000 | 10/5/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/04/2000 at 06:45:03. Contact: ###-####. placed with special insp. pending report. 10/5/2000 4:23:05 PM
|
BLD-Concrete | 10/2/2000 | 10/4/2000 | 10/4/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/02/2000 at 07:04:02. Contact: ###-####. placed w/special insp. pending report. 10/4/2000 1:38:05 PM
|
BLD-Concrete | 10/2/2000 | 10/3/2000 | 10/3/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/02/2000 at 07:03:19. Contact: ###-####. placed w/ special insp. pending report. 10/3/2000 3:40:39 PM
|
BLD-Concrete | 10/2/2000 | 10/2/2000 | 10/2/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/02/2000 at 07:02:38. Contact: ###-####. Scheduled by a col pour and decking in progess ok pending reports.contractor via Hello! on 10/02/2000 at 07:02:38. Contact: ###-####. 10/2/2000 5:11:25 PM
|
BLD-Concrete | 9/29/2000 | 9/29/2000 | 9/29/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 09/29/2000 at 08:47:20. Contact: ###-####. placed with special insp. pendining report. 9/29/2000 4:36:55 PM
|
BLD-Concrete | 9/25/2000 | 9/28/2000 | 9/28/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 09/25/2000 at 12:10:24. Contact: ###-####. covered w/spwcial insp. pending report. 9/28/2000 3:33:54 PM
|
BLD-Concrete | 9/25/2000 | 9/27/2000 | 9/27/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 09/25/2000 at 12:09:40. Contact: ###-####. placed w/special insp.pending report. 9/27/2000 2:22:03 PM
|
BLD-Concrete | 9/25/2000 | 9/26/2000 | 9/26/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 09/25/2000 at 12:06:22. Contact: ###-####. placed w/special insp pending report. 9/26/2000 1:48:12 PM
|
BLD-Concrete | 9/18/2000 | 9/22/2000 | 9/22/2000 | P | FAIL |
Jim Storey
|
|
|
Ken boyd ###-#### colums ar basement elavator pit remove sona forms to observe consolidation. 9/22/2000 3:38:55 PM
|
BLD-Concrete | 9/18/2000 | 9/21/2000 | 9/21/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 09/18/2000 at 12:46:06. Contact: ###-####. placed w/s/i. 9/21/2000 3:42:36 PM
|
BLD-Concrete | 9/18/2000 | 9/20/2000 | 9/20/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 09/18/2000 at 12:45:21. Contact: ###-####. n/r 9/19/2000 3:48:41 PM
|
BLD-Concrete | 9/18/2000 | 9/19/2000 | 9/19/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 09/18/2000 at 12:44:39. Contact: ###-####. pending report from s/i. 9/19/2000 3:47:55 PM
|
BLD-Concrete | 9/18/2000 | 9/18/2000 | 9/18/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 09/18/2000 at 07:17:56. Contact: ###-####. pending report. 9/18/2000 4:57:19 PM
|
BLD-Concrete | 9/8/2000 | 9/15/2000 | 9/15/2000 | P | PART |
Jim Storey
|
|
|
ken ###-####
|
BLD-Concrete | 9/8/2000 | 9/14/2000 | 9/14/2000 | P | PART |
Jim Storey
|
|
|
ken ###-#### colums pending report from special . special insp on site said progrestion going well. 9/14/2000 3:55:44 PM
|
BLD-Concrete | 9/8/2000 | 9/13/2000 | 9/13/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 09/08/2000 at 14:07:34. Contact: ###-####. placed with special insp. pending reports. 9/13/2000 5:53:02 PM
|
BLD-Concrete | 9/8/2000 | 9/12/2000 | 9/12/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 09/08/2000 at 14:06:48. Contact: ###-####. pending report. 9/12/2000 4:38:06 PM
|
BLD-Concrete | 9/8/2000 | 9/11/2000 | 9/11/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 09/08/2000 at 14:06:01. Contact: ###-####.pending report. 9/11/2000 4:55:02 PM
|
BLD-Concrete | 9/1/2000 | 9/8/2000 | 9/8/2000 | P | PART |
|
|
|
ken -- ###-#### concrete still awaitig rfi from eng for conduits in footing of col 9/8/2000 2:16:43 PM
|
BLD-Concrete | 9/1/2000 | 9/7/2000 | 9/7/2000 | P | PART |
|
|
|
ken-- ###-#### concrete pendin sp ins ok 9/8/2000 1:48:10 PM
|
BLD-Concrete | 9/1/2000 | 9/6/2000 | 9/6/2000 | P | PART |
|
|
|
Scheduled by a contractor via Hello! on 09/01/2000 at 08:04:21. Contact: ###-####. pending sp insp report 9/7/2000 3:12:06 PM
|
BLD-Concrete | 9/1/2000 | 9/5/2000 | 9/5/2000 | P | PART |
|
|
|
Scheduled by a contractor via Hello! on 09/01/2000 at 08:03:03. Contact: ###-####. 5 columns and 60+ ft of north wall, also aprox 100 ft of footer at the north, pending sp insp approvals 9/6/2000 11:46:35 AM
|
BLD-Concrete | 8/25/2000 | 9/1/2000 | 9/1/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 08/25/2000 at 13:04:54. Contact: ###-####. placed w/special insp. 9/1/2000 3:49:48 PM
|
BLD-Concrete | 8/25/2000 | 8/31/2000 | 8/31/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 08/25/2000 at 13:00:28. Contact: ###-####.
|
BLD-Concrete | 8/23/2000 | 8/30/2000 | 8/30/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 08/23/2000 at 17:54:18. Contact: ###-####. pending report. 8/29/2000 10:13:20 AM
|
BLD-Concrete | 8/23/2000 | 8/29/2000 | 8/29/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 08/23/2000 at 18:02:47. Contact: ###-####. work 80 % in place appears ok pending report. 8/29/2000 10:12:54 AM
|
BLD-Concrete | 8/23/2000 | 8/28/2000 | 8/28/2000 | P | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 08/23/2000 at 17:50:23. Contact: ###-####.
|
BLD-Concrete | 8/21/2000 | 8/25/2000 | 8/25/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 08/21/2000 at 17:50:59. Contact: ###-####. covered with special ins 8/25/2000 4:29:13 PMp.. 8/25/2000 4:29:23 PM
|
BLD-Concrete | 8/21/2000 | 8/25/2000 | 8/25/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 08/21/2000 at 17:50:59. Contact: ###-####. covered with special ins 8/25/2000 4:29:13 PMp.. 8/25/2000 4:29:23 PM
|
BLD-Concrete | 8/21/2000 | 8/24/2000 | 8/24/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 08/21/2000 at 17:49:33. Contact: ###-####. covered w/special insp. 8/24/2000 3:58:56 PM
|
BLD-Concrete | 8/21/2000 | 8/23/2000 | 8/23/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 08/21/2000 at 17:48:51. Contact: ###-####. covered by s/i. pending report. 8/22/2000 7:13:06 PM
|
BLD-Concrete | 8/21/2000 | 8/22/2000 | 8/22/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 08/21/2000 at 17:48:04. Contact: ###-####. interior pands covered w/special insp pending reports for compliance. 8/22/2000 4:08:34 PM
|
BLD-Concrete | 8/11/2000 | 8/18/2000 | 8/18/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 08/11/2000 at 07:28:51. Contact: ###-####. covered by s/i. 8/18/2000 3:41:17 PM
|
BLD-Concrete | 8/11/2000 | 8/17/2000 | 8/17/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 08/11/2000 at 07:28:15. Contact: ###-####. covered w s/i 8/17/2000 3:11:47 PM
|
BLD-Concrete | 8/11/2000 | 8/16/2000 | 8/16/2000 | P | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 08/11/2000 at 07:27:16. Contact: ###-####. joe called and cancled. 8/16/2000 1:39:00 PM
|
BLD-Footing | 8/11/2000 | 8/15/2000 | 8/15/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 08/11/2000 at 07:22:53. Contact: ###-####. pending report rebar ok. 8/15/2000 5:07:47 PM
|
BLD-Footing | 8/11/2000 | 8/14/2000 | 8/14/2000 | P | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 08/11/2000 at 07:22:01. Contact: ###-####.
|
BLD-Footing | 8/10/2000 | 8/11/2000 | 8/11/2000 | P | PART |
|
|
|
Scheduled by a contractor via Hello! on 08/10/2000 at 08:59:18. Contact: ###-####. ok pending sp insp approvals 8/14/2000 8:05:47 AM
|
BLD-Footing | 8/9/2000 | 8/10/2000 | 8/10/2000 | A | PART |
|
|
|
footing at 10:00 am dave ###-#### - K Point 1 lean filler placed and in progress of placing reinforcing pouring neet line ok to pour with sp insp approvals 8/10/2000 2:21:40 PM
|