Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD00-01563
StatusFinaled
Name MICRON TECHNOLOGY INC
Site Address 8000 S FEDERAL WAY
Project NameMIC 24D/24E-BASEMENT
Customer NumberPCS 3141
ePlanReviewNo
Description
MICRON BUILDING #24D & #24E - BASEMENT AND SUBFAB STRUCTURAL SHELL * TO CONSTRUCT THE BELOW GRADE STRUCTURAL SHELL FOR THE BASEMENT AND SUBFABRICATION AREAS OF NEW BUILDINGS #24D AND 24E. THESE AREAS TO BE CONSTRUCTED OF CONCRETE EXTERIOR WALLS AND FLOORS WITH INTERIOR STEEL STRUCTURAL FRAME. BUILDING #24D BASEMENT: 35,500 SQ. FT. BUILDING #24D SUBFAB: 51,500 SQ. FT. BUILDING #24E BASEMENT: 19,600 SQ. FT. BUILDING #24D AND #24E ARE BEING SEPARATED BY A FOUR-HOUR FIRE-RESISTIVE AREA SEPARATION WALL FOR ALLOWABLE AREA. ALL CONSTRUCTION PER THE APPROVED PLANS AND STRUCTURAL CALCULATIONS ON FILE. THIS IS A FOUNDATION PERMIT ONLY. NO OCCUPANCY IS ALLOWED UNDER THIS PERMIT. SEPARATE TENANT IMPROVEMENT PERMITS WILL BE REQUIRED TO FINISH THESE AREAS FOR OCCUPANCY. THESE BUILDINGS ARE BEING CONSTRUCTED AS AN EXTENSION TO THE SOUTH END OF EXISTING BUILDILNG #24. DRH00-00072/JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIRE-Final Inspection3/12/20023/12/20023/12/2002PPASS
DetailsRick Jackson
I show the sprinkler permit finaled but not life safety.
BLD-Final3/11/20023/11/20023/11/2002PPASS
DetailsJim Storey
Added by Inspector: 301 On 3/11/2002 3:02:55 PM final ok
BLD-Wall cover12/10/200112/12/200112/12/2001AFAIL
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/10/2001 at 16:31:25. Contact: ###-####. pod wires and primitor wires/ fire stop. 12/12/2001 4:33:55 PM
BLD-Wall cover11/30/200112/3/200112/3/2001APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/30/2001 at 14:52:14. Contact: ###-####.
BLD-Final11/10/200111/10/200111/10/2001APART
DetailsJim Storey
Scheduled by Inspector: 301 On 11/10/2001 8:30:10 AM temp final ok pending other trades sign off. ie plm. 11/10/2001 10:14:03 AM
FIRE-Final Inspection11/13/200111/10/200111/10/2001APART
DetailsRick Jackson
Added by Inspector: 409 On 11/13/2001 7:18:40 AM bldg 24D only okay to occupy
FIRE-Conference6/26/20016/27/20016/27/2001PCANC
DetailsRick Jackson
Scheduled by a contractor via Hello! on 06/26/2001 at 11:32:50. Contact: ###-####. request made by mistake 6/27/2001 2:43:07 PM
BLD-Concrete6/21/20016/25/20016/25/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 06/21/2001 at 07:51:10. Contact: ###-####. slab pending report. 6/25/2001 3:55:06 PM
BLD-Concrete6/12/20016/12/20016/12/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 06/12/2001 at 10:34:48. Contact: ###-####. placed with specia 6/13/2001 10:07:58 AMl insp. pending report. 6/13/2001 10:08:36 AM
BLD-Concrete5/29/20015/29/20015/29/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 05/29/2001 at 07:07:34. Contact: ###-####.
BLD-Wall cover5/23/20015/23/20015/23/2001AFAIL
DetailsJim Storey
Scheduled by a contractor via Hello! on 05/23/2001 at 07:17:07. Contact: ###-####. c/n posted. 5/23/2001 12:30:28 PM
BLD-Concrete5/18/20015/18/20015/18/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 05/18/2001 at 06:55:23. Contact: ###-####. placed with special insp. pending report. 5/18/2001 2:27:49 PM
BLD-Concrete5/3/20015/3/20015/3/2001PPART
DetailsSteven Webb
Scheduled by a contractor via Hello! on 05/03/2001 at 08:52:38. Contact: ###-####. Grid line 35 stem wall--north end, ok. 5/3/2001 3:11:08 PM
BLD-Concrete4/30/20014/30/20014/30/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 04/30/2001 at 07:11:53. Contact: ###-####. placed with special insp. pending report. 4/30/2001 2:21:45 PM
BLD-Concrete4/26/20014/27/20014/27/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 04/26/2001 at 07:27:56. Contact: ###-####. placed with special insp pending report. 4/27/2001 1:28:42 PM
BLD-Concrete4/23/20014/26/20014/26/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 04/23/2001 at 12:02:35. Contact: ###-####. placed with specia 4/26/2001 4:08:14 PMl insp. pending r 4/26/2001 4:08:26 PM e 4/26/2001 4:08:26 PMport. 4/26/2001 4:08:38 PM
BLD-Concrete4/23/20014/25/20014/25/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 04/23/2001 at 12:01:31. Contact: ###-####. placed with special insp.pending report. 4/25/2001 4:58:43 PM
BLD-Concrete4/23/20014/24/20014/24/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 04/23/2001 at 12:02:04. Contact: ###-####. placed with special insp. pending report. 4/24/2001 4:40:28 PM
BLD-Concrete4/19/20014/19/20014/19/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 04/19/2001 at 07:30:09. Contact: ###-####. placed wth special insp.pending report. 4/19/2001 3:02:32 PM
BLD-Concrete4/16/20014/16/20014/16/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 04/16/2001 at 07:34:31. Contact: ###-####. wip 4/16/2001 6:30:31 PM
BLD-Concrete4/13/20014/13/20014/13/2001PNR
DetailsJim Storey
Scheduled by a contractor via Hello! on 04/13/2001 at 05:47:09. Contact: ###-####.
BLD-Concrete4/9/20014/11/20014/11/2001PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 04/09/2001 at 05:52:47. Contact: ###-####.
BLD-Concrete4/9/20014/10/20014/10/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 04/09/2001 at 05:52:18. Contact: ###-####. placed with special insp. pending report. 4/10/2001 2:44:15 PM
BLD-Concrete4/9/20014/9/20014/9/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 04/09/2001 at 05:51:50. Contact: ###-####. placed with special insp. pending report. 4/9/2001 4:29:25 PM
BLD-Concrete4/5/20014/6/20014/6/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 04/05/2001 at 06:38:24. Contact: ###-####.
BLD-Concrete4/5/20014/5/20014/5/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 04/05/2001 at 06:37:58. Contact: ###-####. placed with special insp . pending report. 4/5/2001 3:29:24 PM
BLD-Concrete4/2/20014/4/20014/4/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 04/02/2001 at 06:34:42. Contact: ###-####.
BLD-Concrete4/2/20014/3/20014/3/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 04/02/2001 at 06:34:11. Contact: ###-####.
BLD-Concrete4/2/20014/2/20014/2/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 04/02/2001 at 06:33:42. Contact: ###-####. placed with special insp. pending report. 4/2/2001 2:03:37 PM
BLD-Concrete3/30/20013/30/20013/30/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 03/30/2001 at 05:36:46. Contact: ###-####. placed with special insp. pending report. 3/30/2001 12:09:55 PM
BLD-Conference3/30/20013/30/20013/30/2001APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 03/30/2001 at 05:34:56. Contact: ###-####. engineer of record to detirmon ele steel primary or secondary. 3/30/2001 12:09:19 PM
BLD-Concrete3/26/20013/28/20013/28/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 03/26/2001 at 08:21:40. Contact: ###-####. placed w/special insp.pending report. 3/28/2001 2:08:30 PM
BLD-Concrete3/26/20013/27/20013/27/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 03/26/2001 at 08:21:08. Contact: ###-####. placed with special insp.pending report. 3/28/2001 9:52:34 AM
BLD-Concrete3/26/20013/26/20013/26/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 03/26/2001 at 08:20:37. Contact: ###-####. placed with special insp pending report. 3/26/2001 3:33:21 PM
BLD-Concrete3/22/20013/23/20013/23/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 03/22/2001 at 08:12:37. Contact: ###-####. placed with special insp. pending report. 3/23/2001 2:21:01 PM
BLD-Concrete3/22/20013/22/20013/22/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 03/22/2001 at 08:12:08. Contact: ###-####. placed with special insp. pending report. 3/22/2001 4:10:40 PM
BLD-Concrete3/19/20013/21/20013/21/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 03/19/2001 at 07:16:33. Contact: ###-####. placed with special insp. 3/21/2001 5:24:32 PM
BLD-Concrete3/19/20013/20/20013/20/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 03/19/2001 at 07:16:12. Contact: ###-####.
BLD-Concrete3/19/20013/19/20013/19/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 03/19/2001 at 07:15:44. Contact: ###-####. placed with spoecial insp.pending report. 3/19/2001 1:46:40 PM
BLD-Concrete3/16/20013/16/20013/16/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 03/16/2001 at 06:26:59. Contact: ###-####. placed 3/16/2001 2:24:18 PM
BLD-Concrete3/13/20013/15/20013/15/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 03/13/2001 at 05:51:06. Contact: ###-####. placed with special insp. pending report. 3/15/2001 4:38:23 PM
BLD-Concrete3/13/20013/14/20013/14/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 03/13/2001 at 05:49:44. Contact: ###-####. covered with special insp.pending report. 3/14/2001 4:39:38 PM
BLD-Concrete3/13/20013/13/20013/13/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 03/13/2001 at 05:49:05. Contact: ###-####. placed with special insp.pending report. 3/13/2001 12:59:10 PM
BLD-Concrete3/6/20013/8/20013/8/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 03/06/2001 at 05:45:47. Contact: ###-####. placed with special insp. pending report. 3/8/2001 5:05:58 PM
BLD-Concrete3/6/20013/7/20013/7/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 03/06/2001 at 05:45:20. Contact: ###-####. PLACED WITH SPECIAL INSP PENDING REPORTS. 3/7/2001 5:35:02 PM
BLD-Concrete3/6/20013/6/20013/6/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 03/06/2001 at 05:44:50. Contact: ###-####. PLACED WITH SPECIALL INSP PENDING REPORTS 3/7/2001 5:34:23 PM
BLD-Concrete2/28/20013/2/20013/2/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 02/28/2001 at 05:42:34. Contact: ###-####. placed with special insp. pending report. 3/2/2001 3:18:21 PM
BLD-Concrete2/28/20013/1/20013/1/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 02/28/2001 at 05:42:01. Contact: ###-####. covered with special insp. pending report. 3/1/2001 1:54:35 PM
BLD-Concrete2/28/20012/28/20012/28/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 02/28/2001 at 05:41:23. Contact: ###-####. placed with special insp.pending report. 2/28/2001 3:41:54 PM
BLD-Concrete2/19/20012/22/20012/22/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 02/19/2001 at 07:09:24. Contact: ###-####. placed with special insp. pending report. 2/23/2001 10:52:15 AM
BLD-Concrete2/19/20012/21/20012/21/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 02/19/2001 at 07:08:55. Contact: ###-####. covered with special insp. pending report. 2/21/2001 12:24:40 PM
BLD-Concrete2/19/20012/20/20012/20/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 02/19/2001 at 07:08:25. Contact: ###-####. placed with special insp. 2/20/2001 3:34:50 PM
BLD-Concrete2/15/20012/16/20012/16/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 02/15/2001 at 06:03:06. Contact: ###-####. placed with special insp. pending report. 2/20/2001 9:03:16 AM
BLD-Concrete2/15/20012/15/20012/15/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 02/15/2001 at 06:02:29. Contact: ###-####. placed with special insp. pending report. 2/15/2001 2:49:40 PM
BLD-Concrete2/12/20012/14/20012/14/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 02/12/2001 at 07:20:06. Contact: ###-####. placed with special insp. pending report. 2/14/2001 2:57:11 PM
BLD-Concrete2/12/20012/13/20012/13/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 02/12/2001 at 07:19:40. Contact: ###-####. placed with special insp. pending report. 2/13/2001 2:03:02 PM
BLD-Concrete2/12/20012/13/20012/13/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 02/12/2001 at 07:19:40. Contact: ###-####. placed with special insp. pending report. 2/13/2001 2:03:02 PM
BLD-Concrete2/12/20012/12/20012/12/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 02/12/2001 at 07:19:10. Contact: ###-####. placed with 2/12/2001 1:09:40 PM
BLD-Concrete2/7/20012/9/20012/9/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 02/07/2001 at 06:41:13. Contact: ###-####. placed with special insp. pending report. 2/11/2001 9:21:33 PM
BLD-Concrete2/7/20012/8/20012/8/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 02/07/2001 at 06:40:40. Contact: ###-####. placed with special insp. pending report. 2/8/2001 2:40:06 PM
BLD-Concrete2/5/20012/7/20012/7/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 02/05/2001 at 06:45:14. Contact: ###-####. placed with special insp. pending report. 2/7/2001 3:53:03 PM
BLD-Concrete2/5/20012/6/20012/6/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 02/05/2001 at 06:44:46. Contact: ###-####. placed with special insp. pending report. 2/6/2001 4:57:15 PM
BLD-Concrete2/5/20012/5/20012/5/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 02/05/2001 at 06:44:16. Contact: ###-####. Scheduled by a placed with special insp. pending report.contractor via Hello! on 02/05/2001 at 06:44:16. Contact: ###-####. 2/5/2001 6:11:39 PM
BLD-Wall cover2/2/20012/5/20012/5/2001ANR
DetailsJim Storey
Scheduled by a contractor via Hello! on 02/02/2001 at 06:49:54. Contact: ###-####.
BLD-Concrete2/1/20012/2/20012/2/2001PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 02/01/2001 at 08:02:46. Contact: ###-####. pending insp report. 2/2/2001 2:10:10 PM
BLD-Concrete2/1/20012/1/20012/1/2001PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 02/01/2001 at 08:02:17. Contact: ###-####....pend report 2/1/2001 2:56:01 PM
BLD-Concrete1/29/20011/31/20011/31/2001PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 01/29/2001 at 06:35:40. Contact: ###-####. pend spec insp report. 1/31/2001 12:40:52 PM
BLD-Concrete1/29/20011/30/20011/30/2001PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 01/29/2001 at 06:35:07. Contact: ###-####... pending spec. insp report 1/30/2001 1:54:47 PM
BLD-Concrete1/29/20011/29/20011/29/2001PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 01/29/2001 at 06:34:31. Contact: ###-####. pend spec insp report 1/29/2001 9:47:02 AM
BLD-Concrete1/24/20011/25/20011/25/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 01/24/2001 at 14:22:07. Contact: ###-####. placed with special insp. pending report. 1/25/2001 5:52:12 PM
BLD-Framing/Rough-in1/25/20011/25/20011/25/2001AFAIL
DetailsJim Storey
Scheduled by a contractor via Hello! on 01/25/2001 at 05:55:06. Contact: ###-####. basement h-3 occ need to review plan in furthere detial as to chem exsust duct and tunnel coridor wall ref. 1/25/2001 5:51:41 PM
BLD-Concrete1/22/20011/24/20011/24/2001PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 01/22/2001 at 05:21:10. Contact: ###-####. work in progess. 1/24/2001 5:34:06 PM
BLD-Concrete1/22/20011/23/20011/23/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 01/22/2001 at 05:20:38. Contact: ###-####. placed with special insp. pending report. 1/23/2001 2:12:47 PM
BLD-Concrete1/22/20011/23/20011/23/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 01/22/2001 at 05:20:38. Contact: ###-####. placed with special insp. pending report. 1/23/2001 2:12:47 PM
BLD-Concrete1/22/20011/22/20011/22/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 01/22/2001 at 05:20:08. Contact: ###-####. placed w/s/p/i pending report. 1/22/2001 4:37:35 PM
BLD-Concrete1/19/20011/19/20011/19/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 01/19/2001 at 05:40:09. Contact: ###-####. placed with special insp. pending report. 1/19/2001 2:20:05 PM
BLD-Concrete1/19/20011/19/20011/19/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 01/19/2001 at 05:40:09. Contact: ###-####. placed with special insp. pending report. 1/19/2001 2:20:05 PM
BLD-Concrete1/15/20011/18/20011/18/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 01/15/2001 at 07:15:22. Contact: ###-####. placed with special insp. pending report. 1/18/2001 4:14:59 PM
BLD-Concrete1/15/20011/17/20011/17/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 01/15/2001 at 07:14:41. Contact: ###-####.
BLD-Concrete1/15/20011/16/20011/16/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 01/15/2001 at 07:13:57. Contact: ###-####. placed with special insp. pending report. 1/17/2001 9:48:39 AM
BLD-Concrete1/10/20011/12/20011/12/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 01/10/2001 at 07:22:25. Contact: ###-####.placed with special insp. pending report. 1/12/2001 2:06:42 PM
BLD-Concrete1/10/20011/11/20011/11/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 01/10/2001 at 07:21:55. Contact: ###-####. placed with special insp. pending report. 1/11/2001 3:18:54 PM
BLD-Concrete1/8/20011/10/20011/10/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 01/08/2001 at 07:07:21. Contact: ###-####. placed with special insp. pending report. 1/9/2001 1:28:43 PM
BLD-Concrete1/8/20011/9/20011/9/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 01/08/2001 at 07:06:53. Contact: ###-####. placed with special insp. pending report. 1/9/2001 1:28:20 PM
BLD-Concrete1/8/20011/8/20011/8/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 01/08/2001 at 07:06:20. Contact: ###-####.placed with special insp. pending report. 1/8/2001 4:28:23 PM
BLD-Concrete1/2/20011/4/20011/4/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 01/02/2001 at 07:04:42. Contact: ###-####. waffel deck placement north west sec. pending report from special insp. c/n for welds performed on wall plates painted and not removed before welding I beams for pipe racking in basement. Grout not placed for 2 nd floor east wall work in progess will re insp 1/5/2001/ 1/4/2001 4:31:12 PM 1/4/2001 4:32:41 PM
BLD-Concrete1/2/20011/4/20011/4/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 01/02/2001 at 07:04:42. Contact: ###-####. waffel deck placement north west sec. pending report from special insp. c/n for welds performed on wall plates painted and not removed before welding I beams for pipe racking in basement. Grout not placed for 2 nd floor east wall work in progess will re insp 1/5/2001/ 1/4/2001 4:31:12 PM 1/4/2001 4:32:41 PM
BLD-Concrete1/2/20011/3/20011/3/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 01/02/2001 at 07:04:13. Contact: ###-####. placed with special insp. pending report. 1/3/2001 5:00:16 PM
BLD-Concrete1/2/20011/2/20011/2/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 01/02/2001 at 07:03:37. Contact: ###-####. placed with special insp.pending report. 1/2/2001 3:23:29 PM
BLD-Concrete12/29/200012/29/200012/29/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/29/2000 at 06:52:37. Contact: ###-####. placed with special insp. pending report. 12/29/2000 5:00:18 PM
BLD-Concrete12/26/200012/28/200012/28/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/26/2000 at 07:05:23. Contact: ###-####. #1 peir at north end of tressill rock drilling in progess for ft stablition and soil pinning. 12/27/2000 3:29:33 PM
BLD-Concrete12/26/200012/27/200012/27/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/26/2000 at 07:04:43. Contact: ###-####. tressel steel fram on site from fabracator bolting and weld conection in progess as well as piping supports to first truss. work in progess. 12/27/2000 3:27:22 PM
BLD-Foundation11/27/200012/27/200012/27/2000APART
DetailsJim Storey
joe ###-#### found- tressel work in progess covered with special insp. 12/27/2000 10:59:58 AM
BLD-Concrete12/26/200012/26/200012/26/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/26/2000 at 07:04:03. Contact: ###-####. placed with special insp. pending report. 12/26/2000 4:16:58 PM
BLD-Concrete12/20/200012/22/200012/22/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/20/2000 at 07:12:56. Contact: ###-####. placed with special insp. 12/21/2000 2:31:55 PM
BLD-Concrete12/20/200012/21/200012/21/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/20/2000 at 07:12:27. Contact: ###-####. placed with special insp. report to reflect hook bar change form engineer of record. 12/21/2000 4:12:14 PM
BLD-Concrete12/18/200012/20/200012/20/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/18/2000 at 07:27:37. Contact: ###-####. placed with special insp. pending report. 12/20/2000 10:17:33 PM need engineering for peir 1# pipe under footting. 12/20/2000 10:18:53 PM
BLD-Foundation11/27/200012/20/200012/20/2000APART
DetailsJim Storey
found -tressel joe ###-#### need engineering to justafy #1 peir footing configuration w/ pipe under footting. 12/20/2000 2:03:03 PM
BLD-Concrete12/18/200012/19/200012/19/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/18/2000 at 07:27:04. Contact: ###-####. placed with special insp. pending report. 12/19/2000 3:10:00 PM 12/19/2000 3:10:11 PM
BLD-Concrete12/18/200012/18/200012/18/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/18/2000 at 07:26:24. Contact: ###-####. placed with special insp. pending report. 12/19/2000 9:03:48 AM
BLD-Concrete12/14/200012/15/200012/15/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/14/2000 at 07:32:02. Contact: ###-####. placed with special insp. 12/15/2000 4:05:11 PM
BLD-Concrete12/14/200012/14/200012/14/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/14/2000 at 07:31:31. Contact: ###-####. placed with special insp. pending report. 12/14/2000 4:12:53 PM
BLD-Concrete12/11/200012/13/200012/13/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/11/2000 at 08:40:19. Contact: ###-####. placed with special insp. 12/13/2000 4:43:27 PM
BLD-Foundation11/27/200012/13/200012/13/2000APART
DetailsJim Storey
found -tressel joe ###-#### placed with special insp. pending report. 12/13/2000 9:16:52 AM
BLD-Concrete12/11/200012/12/200012/12/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/11/2000 at 08:39:45. Contact: ###-####. placed with special insp. pending report. 12/12/2000 4:55:52 PM
BLD-Concrete12/11/200012/11/200012/11/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/11/2000 at 08:39:13. Contact: ###-####. placed w/s/i pending report. 12/11/2000 2:37:10 PM
BLD-Concrete12/7/200012/8/200012/8/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/07/2000 at 15:08:37. Contact: ###-####. neeed plan change for deletion of #3 24 oc at bottom of waffel slab. 12/8/2000 3:34:08 PM
BLD-Concrete12/5/200012/7/200012/7/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/05/2000 at 07:24:33. Contact: ###-####. work in progess cancled for 12/8/2k. 12/7/2000 3:37:39 PM
BLD-Concrete12/5/200012/7/200012/7/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/05/2000 at 07:24:33. Contact: ###-####. work in progess cancled for 12/8/2k. 12/7/2000 3:37:39 PM
BLD-Concrete12/4/200012/6/200012/6/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/04/2000 at 08:46:30. Contact: ###-####. placed with special insp. 12/6/2000 2:18:42 PM
BLD-Foundation11/27/200012/6/200012/6/2000APART
DetailsJim Storey
found tressel--joe ###-#### placed with special insp. 12/6/2000 2:19:22 PM
BLD-Concrete12/4/200012/5/200012/5/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/04/2000 at 08:45:59. Contact: ###-####. work in progess c/w/s/i 12/5/2000 3:34:04 PM
BLD-Concrete12/4/200012/4/200012/4/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/04/2000 at 08:45:24. Contact: ###-####. placed with special insp. pending report. 12/4/2000 4:02:43 PM
BLD-Concrete11/29/200012/1/200012/1/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/29/2000 at 06:36:15. Contact: ###-####. placed with special insp. pending report. 12/1/2000 1:08:38 PM
BLD-Concrete11/29/200011/30/200011/30/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/29/2000 at 06:35:34. Contact: ###-####. placed with special insp pending report. 11/30/2000 5:15:24 PM
BLD-Concrete11/27/200011/29/200011/29/2000PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/27/2000 at 07:04:49. Contact: ###-####.
BLD-Foundation11/27/200011/29/200011/29/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/27/2000 at 09:00:56. Contact: ###-####. p/w/s/i. walk through waffel slab beingstriped looks very good. 11/29/2000 12:52:06 PM
BLD-Foundation11/27/200011/29/200011/29/2000APART
DetailsJim Storey
joe-- ###-#### found--tressel.north cassion drilled pending s/i report. 11/29/2000 1:48:57 PM
BLD-Concrete11/27/200011/28/200011/28/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/27/2000 at 07:04:07. Contact: ###-####. p/w/s/i pending report. 11/28/2000 3:48:55 PM
BLD-Concrete11/27/200011/27/200011/27/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/27/2000 at 07:03:28. Contact: ###-####. placed with special insp. work in progess. 11/27/2000 3:56:41 PM
BLD-Concrete11/20/200011/24/200011/24/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/20/2000 at 18:38:33. Contact: ###-####. placed with special inspection pending report. 11/24/2000 1:05:27 PM
BLD-Concrete11/20/200011/21/200011/21/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/20/2000 at 18:37:36. Contact: ###-####. placed with special insp pending report. 11/21/2000 2:50:02 PM
BLD-Concrete11/16/200011/17/200011/17/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/16/2000 at 07:52:52. Contact: ###-####. placed w/s/i 11/17/2000 5:05:57 PM
BLD-Concrete11/16/200011/16/200011/16/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/16/2000 at 07:52:13. Contact: ###-####. placed with special inspection pending report. 11/16/2000 4:12:01 PM
BLD-Concrete11/13/200011/15/200011/15/2000PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 11/13/2000 at 09:19:21. Contact: ###-####. pend spec. insp. report 11/15/2000 4:01:48 PM
BLD-Concrete11/13/200011/14/200011/14/2000PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 11/13/2000 at 09:18:34. Contact: ###-####...pend report from spec. insp. agcy. 11/14/2000 10:51:08 AM
BLD-Concrete11/9/200011/13/200011/13/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/09/2000 at 15:43:41. Contact: ###-####. placed with special insp. pending report. 11/13/2000 9:30:57 PM
BLD-Concrete11/6/200011/8/200011/8/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/06/2000 at 07:59:05. Contact: ###-####. placed w s/i pending report 11/8/2000 4:23:57 PM
BLD-Concrete11/6/200011/7/200011/7/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/06/2000 at 07:58:12. Contact: ###-####. placed w/si p. report on site walk through and spoke w s/i ok having sch meeting. 11/7/2000 5:28:38 PM
BLD-Concrete11/6/200011/6/200011/6/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/06/2000 at 07:57:33. Contact: ###-####. placed w/special insp. pending report. 11/6/2000 4:20:17 PM
BLD-Concrete11/6/200011/6/200011/6/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/06/2000 at 07:57:33. Contact: ###-####. placed w/special insp. pending report. 11/6/2000 4:20:17 PM
BLD-Concrete11/1/200011/3/200011/3/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/01/2000 at 07:12:44. Contact: ###-####. placed with special insp. pending report. 11/3/2000 3:26:19 PM
BLD-Concrete11/1/200011/2/200011/2/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/01/2000 at 07:12:02. Contact: ###-####. placed with special ins 11/2/2000 3:27:22 PMp.pending report. 11/2/2000 3:27:32 PM
BLD-Concrete10/30/200011/1/200011/1/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/30/2000 at 09:10:49. Contact: ###-####. placed with special insp. pending report. 11/1/2000 4:12:30 PM
BLD-Concrete10/30/200010/31/200010/31/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/30/2000 at 09:09:58. Contact: ###-####. placed with special insp. pe nding report.10/31/2000 4:59:41 PM 10/31/2000 5:00:07 PM
BLD-Concrete10/30/200010/30/200010/30/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/30/2000 at 09:09:12. Contact: ###-####.
BLD-Concrete10/25/200010/27/200010/27/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/25/2000 at 09:25:52. Contact: ###-####. placed with special insp.pending report. 10/27/2000 3:17:39 PM
BLD-Concrete10/25/200010/26/200010/26/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/25/2000 at 09:25:09. Contact: ###-####. placed w/special insp. pending report. 10/26/2000 2:05:16 PM
BLD-Concrete10/23/200010/25/200010/25/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/23/2000 at 07:58:34. Contact: ###-####. placed w/special insp. pending report. 10/25/2000 4:09:43 PM
BLD-Concrete10/23/200010/24/200010/24/2000PCANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/23/2000 at 07:57:51. Contact: ###-####.
BLD-Concrete10/23/200010/23/200010/23/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/23/2000 at 07:57:09. Contact: ###-####.
BLD-Concrete10/16/200010/20/200010/20/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/16/2000 at 15:19:51. Contact: ###-####. placed w/ special ins pending report. 10/20/2000 12:10:47 PM
BLD-Concrete10/16/200010/19/200010/19/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/16/2000 at 15:18:42. Contact: ###-####. pending report. 10/19/2000 5:05:24 PM
BLD-Concrete10/16/200010/18/200010/18/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/16/2000 at 15:17:56. Contact: ###-####. placed with special insp. pending 10/18/2000 3:14:33 PM report 10/18/2000 3:14:36 PM . 10/18/2000 3:14:40 PM
BLD-Concrete10/16/200010/17/200010/17/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/16/2000 at 15:17:17. Contact: ###-####.
BLD-Concrete10/11/200010/13/200010/13/2000PCANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/11/2000 at 08:13:46. Contact: ###-####.
BLD-Concrete10/10/200010/12/200010/12/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/10/2000 at 07:24:54. Contact: ###-####. placed w/special insp. 10/12/2000 3:57:04 PM
BLD-Concrete10/10/200010/11/200010/11/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/10/2000 at 07:24:09. Contact: ###-####. placed w/special insp. pending report. 10/11/2000 4:20:25 PM
BLD-Concrete10/6/200010/10/200010/10/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/06/2000 at 07:00:01. Contact: ###-####. progess very good. pending reports for concrete strength. 10/10/2000 1:02:52 PM
BLD-Concrete10/6/200010/9/200010/9/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/06/2000 at 06:59:13. Contact: ###-####. placed with special insp. pending report. 10/9/2000 4:36:58 PM
BLD-Concrete10/4/200010/6/200010/6/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/04/2000 at 06:45:44. Contact: ###-####. placed with special insp. pending report. 10/6/2000 4:13:39 PM
BLD-Concrete10/4/200010/5/200010/5/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/04/2000 at 06:45:03. Contact: ###-####. placed with special insp. pending report. 10/5/2000 4:23:05 PM
BLD-Concrete10/2/200010/4/200010/4/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/02/2000 at 07:04:02. Contact: ###-####. placed w/special insp. pending report. 10/4/2000 1:38:05 PM
BLD-Concrete10/2/200010/3/200010/3/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/02/2000 at 07:03:19. Contact: ###-####. placed w/ special insp. pending report. 10/3/2000 3:40:39 PM
BLD-Concrete10/2/200010/2/200010/2/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/02/2000 at 07:02:38. Contact: ###-####. Scheduled by a col pour and decking in progess ok pending reports.contractor via Hello! on 10/02/2000 at 07:02:38. Contact: ###-####. 10/2/2000 5:11:25 PM
BLD-Concrete9/29/20009/29/20009/29/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 09/29/2000 at 08:47:20. Contact: ###-####. placed with special insp. pendining report. 9/29/2000 4:36:55 PM
BLD-Concrete9/25/20009/28/20009/28/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 09/25/2000 at 12:10:24. Contact: ###-####. covered w/spwcial insp. pending report. 9/28/2000 3:33:54 PM
BLD-Concrete9/25/20009/27/20009/27/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 09/25/2000 at 12:09:40. Contact: ###-####. placed w/special insp.pending report. 9/27/2000 2:22:03 PM
BLD-Concrete9/25/20009/26/20009/26/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 09/25/2000 at 12:06:22. Contact: ###-####. placed w/special insp pending report. 9/26/2000 1:48:12 PM
BLD-Concrete9/18/20009/22/20009/22/2000PFAIL
DetailsJim Storey
Ken boyd ###-#### colums ar basement elavator pit remove sona forms to observe consolidation. 9/22/2000 3:38:55 PM
BLD-Concrete9/18/20009/21/20009/21/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 09/18/2000 at 12:46:06. Contact: ###-####. placed w/s/i. 9/21/2000 3:42:36 PM
BLD-Concrete9/18/20009/20/20009/20/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 09/18/2000 at 12:45:21. Contact: ###-####. n/r 9/19/2000 3:48:41 PM
BLD-Concrete9/18/20009/19/20009/19/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 09/18/2000 at 12:44:39. Contact: ###-####. pending report from s/i. 9/19/2000 3:47:55 PM
BLD-Concrete9/18/20009/18/20009/18/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 09/18/2000 at 07:17:56. Contact: ###-####. pending report. 9/18/2000 4:57:19 PM
BLD-Concrete9/8/20009/15/20009/15/2000PPART
DetailsJim Storey
ken ###-####
BLD-Concrete9/8/20009/14/20009/14/2000PPART
DetailsJim Storey
ken ###-#### colums pending report from special . special insp on site said progrestion going well. 9/14/2000 3:55:44 PM
BLD-Concrete9/8/20009/13/20009/13/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 09/08/2000 at 14:07:34. Contact: ###-####. placed with special insp. pending reports. 9/13/2000 5:53:02 PM
BLD-Concrete9/8/20009/12/20009/12/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 09/08/2000 at 14:06:48. Contact: ###-####. pending report. 9/12/2000 4:38:06 PM
BLD-Concrete9/8/20009/11/20009/11/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 09/08/2000 at 14:06:01. Contact: ###-####.pending report. 9/11/2000 4:55:02 PM
BLD-Concrete9/1/20009/8/20009/8/2000PPART
Details
ken -- ###-#### concrete still awaitig rfi from eng for conduits in footing of col 9/8/2000 2:16:43 PM
BLD-Concrete9/1/20009/7/20009/7/2000PPART
Details
ken-- ###-#### concrete pendin sp ins ok 9/8/2000 1:48:10 PM
BLD-Concrete9/1/20009/6/20009/6/2000PPART
Details
Scheduled by a contractor via Hello! on 09/01/2000 at 08:04:21. Contact: ###-####. pending sp insp report 9/7/2000 3:12:06 PM
BLD-Concrete9/1/20009/5/20009/5/2000PPART
Details
Scheduled by a contractor via Hello! on 09/01/2000 at 08:03:03. Contact: ###-####. 5 columns and 60+ ft of north wall, also aprox 100 ft of footer at the north, pending sp insp approvals 9/6/2000 11:46:35 AM
BLD-Concrete8/25/20009/1/20009/1/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 08/25/2000 at 13:04:54. Contact: ###-####. placed w/special insp. 9/1/2000 3:49:48 PM
BLD-Concrete8/25/20008/31/20008/31/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 08/25/2000 at 13:00:28. Contact: ###-####.
BLD-Concrete8/23/20008/30/20008/30/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 08/23/2000 at 17:54:18. Contact: ###-####. pending report. 8/29/2000 10:13:20 AM
BLD-Concrete8/23/20008/29/20008/29/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 08/23/2000 at 18:02:47. Contact: ###-####. work 80 % in place appears ok pending report. 8/29/2000 10:12:54 AM
BLD-Concrete8/23/20008/28/20008/28/2000PCANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 08/23/2000 at 17:50:23. Contact: ###-####.
BLD-Concrete8/21/20008/25/20008/25/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 08/21/2000 at 17:50:59. Contact: ###-####. covered with special ins 8/25/2000 4:29:13 PMp.. 8/25/2000 4:29:23 PM
BLD-Concrete8/21/20008/25/20008/25/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 08/21/2000 at 17:50:59. Contact: ###-####. covered with special ins 8/25/2000 4:29:13 PMp.. 8/25/2000 4:29:23 PM
BLD-Concrete8/21/20008/24/20008/24/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 08/21/2000 at 17:49:33. Contact: ###-####. covered w/special insp. 8/24/2000 3:58:56 PM
BLD-Concrete8/21/20008/23/20008/23/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 08/21/2000 at 17:48:51. Contact: ###-####. covered by s/i. pending report. 8/22/2000 7:13:06 PM
BLD-Concrete8/21/20008/22/20008/22/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 08/21/2000 at 17:48:04. Contact: ###-####. interior pands covered w/special insp pending reports for compliance. 8/22/2000 4:08:34 PM
BLD-Concrete8/11/20008/18/20008/18/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 08/11/2000 at 07:28:51. Contact: ###-####. covered by s/i. 8/18/2000 3:41:17 PM
BLD-Concrete8/11/20008/17/20008/17/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 08/11/2000 at 07:28:15. Contact: ###-####. covered w s/i 8/17/2000 3:11:47 PM
BLD-Concrete8/11/20008/16/20008/16/2000PCANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 08/11/2000 at 07:27:16. Contact: ###-####. joe called and cancled. 8/16/2000 1:39:00 PM
BLD-Footing8/11/20008/15/20008/15/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 08/11/2000 at 07:22:53. Contact: ###-####. pending report rebar ok. 8/15/2000 5:07:47 PM
BLD-Footing8/11/20008/14/20008/14/2000PCANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 08/11/2000 at 07:22:01. Contact: ###-####.
BLD-Footing8/10/20008/11/20008/11/2000PPART
Details
Scheduled by a contractor via Hello! on 08/10/2000 at 08:59:18. Contact: ###-####. ok pending sp insp approvals 8/14/2000 8:05:47 AM
BLD-Footing8/9/20008/10/20008/10/2000APART
Details
footing at 10:00 am dave ###-#### - K Point 1 lean filler placed and in progress of placing reinforcing pouring neet line ok to pour with sp insp approvals 8/10/2000 2:21:40 PM