BLD-Final | 7/31/2000 | 8/1/2000 | 8/1/2000 | A | PASS |
Carl Dependahl
|
|
|
|
FIRE-Final Inspection | 7/30/2000 | 7/31/2000 | 7/31/2000 | P | FAIL |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 07/30/2000 at 20:01:54. Contact: . residence should be structural inspection 8/1/00 4:53:57 PM
|
FIRE-Final Inspection | 7/28/2000 | 7/28/2000 | 7/28/2000 | P | FAIL |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 07/28/2000 at 09:23:43. Contact: . Should be structural inspection. 7/31/00 8:31:43 AM
|
BLD-Framing/Rough-in | 7/3/2000 | 7/3/2000 | 7/3/2000 | P | PART |
|
|
|
Added by Inspector: 338 On 7/3/00 ok to cover with elec approval only
|
FIRE-Final Inspection | 7/3/2000 | 7/3/2000 | 7/3/2000 | P | FAIL |
|
|
|
Scheduled by a contractor via Hello! on 07/03/2000 at 07:50:35. Contact: ###-####. this is to be a framing rough 7/3/00 1:45:27 PM
|
BLD-Foundation | 6/8/2000 | 6/9/2000 | 6/9/2000 | A | PASS |
Alan Hauser
|
|
|
Don Dugger ###-#### late morning
|
BLD-Footing | 6/7/2000 | 6/8/2000 | 6/8/2000 | A | PASS |
Alan Hauser
|
|
|
###-####
|