BLD-Final | 11/17/2000 | 11/20/2000 | 11/20/2000 | P | PASS |
Jim Sly
|
|
|
Brad ###-#### key above the front door to get into the house
|
BLD-Final | 11/6/2000 | 11/6/2000 | 11/6/2000 | P | PASS |
Jim Sly
|
|
|
BRAD ###-#### FN OCC-- KEY UNDER FRONT DOOR MATT
|
BLD-Final | 9/26/2000 | 9/27/2000 | 9/27/2000 | A | FAIL |
Alan Hauser
|
|
|
Brad ###-#### there is a key above the overhead garage door
|
BLD-Foundation | 8/30/2000 | 8/31/2000 | 8/31/2000 | A | NR |
Alan Hauser
|
|
|
Chris ###-####
|
BLD-Energy code compliance | 7/26/2000 | 7/27/2000 | 7/27/2000 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 07/26/2000 at 15:22:52. Contact: ###-####.
|
BLD-Framing/Rough-in | 7/25/2000 | 7/26/2000 | 7/26/2000 | A | PASS |
Jim Sly
|
|
|
###-####-brad fr
|
BLD-Framing/Rough-in | 7/18/2000 | 7/19/2000 | 7/19/2000 | A | FAIL |
Jim Sly
|
|
|
shear inspection Brad ###-####
|
BLD-Framing/Rough-in | 7/19/2000 | 7/19/2000 | 7/19/2000 | P | PART |
Jim Sly
|
|
|
shear panel Brad ###-#### Shear ok 7/20/00 9:33:29 AM
|
BLD-Framing/Rough-in | 7/18/2000 | 7/18/2000 | 7/18/2000 | P | FAIL |
Jim Sly
|
|
|
shear brad ###-####
|
BLD-Framing/Rough-in | 7/14/2000 | 7/17/2000 | 7/17/2000 | A | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 07/14/2000 at 16:39:07. Contact: ###-####. Fail- 2nd C/N....conf. w/framer. 7/18/00 2:01:45 PM
|
BLD-Framing/Rough-in | 7/13/2000 | 7/13/2000 | 7/13/2000 | P | FAIL |
Jim Storey
|
|
|
brad ###-#### reinspection no c/n on site. 7/14/00 7:10:06 AM
|
BLD-Framing/Rough-in | 7/11/2000 | 7/12/2000 | 7/12/2000 | A | FAIL |
Jim Storey
|
|
|
shear wall brad ###-#### trans to perry 7/12/00 9:44:15 AM
|
BLD-Framing/Rough-in | 7/12/2000 | 7/12/2000 | 7/12/2000 | A | FAIL |
|
|
|
Scheduled by Inspector: 338 On 7/12/00 verbal c/n need full framing members on all required brace panels...must recall 7/12/00 10:40:02 AM
|
BLD-Foundation | 6/28/2000 | 6/29/2000 | 6/29/2000 | A | PASS |
Jim Sly
|
|
|
###-####
|
BLD-Footing | 6/27/2000 | 6/28/2000 | 6/28/2000 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 06/27/2000 at 12:38:52. Contact: ###-####.
|