BLD-Aging Inspection | 2/26/2003 | 2/26/2003 | 2/26/2003 | | PASS |
Jim Sly
|
|
|
Previously passed by 425 for Perm. Occ. 2/26/2003 12:33:19 PM
|
BLD-Final | 1/31/2002 | 1/31/2002 | 1/31/2002 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 01/31/2002 at 09:17:17. Contact: ###-####. ok for perm occ. 1/31/2002 2:11:39 PM
|
Permanent Occupancy | | 1/31/2002 | 1/31/2002 | | DONE |
|
|
|
|
BLD-Final | 1/25/2002 | 1/25/2002 | 1/25/2002 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 01/25/2002 at 08:54:18. Contact: ###-####. OK for Temp Occ. C/N Provide Permanent 1hr self closing door at Bsmnt/Crawl Obtain Perm Occ status within 90 days of this notice. 1/25/2002 12:13:08 PM
|
BLD-Conference | 1/24/2002 | 1/24/2002 | 1/24/2002 | P | PART |
Jim Sly
|
|
|
for conf paul- ###-####
|
FIRE-Final Inspection | 1/23/2002 | 1/24/2002 | 1/24/2002 | A | PASS |
Troy Cobbley
|
|
|
life safety finaled at the 6085 N. Eagle road address 1/24/2002 3:39:05 PM
|
BLD-Framing/Rough-in | 11/19/2001 | 11/20/2001 | 11/20/2001 | A | PART |
Jim Sly
|
|
|
PAUL Upstairs only. OK Need all trade R/I inspections on Basement. 11/20/2001 10:52:46 AM 11/20/2001 10:55:37 AM
|
BLD-Framing/Rough-in | 11/15/2001 | 11/16/2001 | 11/16/2001 | A | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/15/2001 at 11:51:20. Contact: ###-####. C/N posted. 11/16/2001 9:59:49 AM
|
BLD-Conference | 11/6/2001 | 11/6/2001 | 11/6/2001 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/06/2001 at 10:07:04. Contact: ###-####.
|
BLD-Final | 7/10/2001 | 7/11/2001 | 7/11/2001 | P | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 07/10/2001 at 16:06:02. Contact: ###-####. Need all signatures. 7/11/2001 5:11:13 PM
|
FIRE-Final Inspection | 7/10/2001 | 7/11/2001 | 7/11/2001 | P | FAIL |
Joe Tawney
|
|
|
Final Fail C/N issued 7/11/2001 2:46:08 PM
|
BLD-Wall cover | 4/29/2001 | 4/30/2001 | 4/30/2001 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 04/29/2001 at 20:27:56. Contact: ###-####. Frame OK for South T I, Shell and Bsmnt. 4/30/2001 12:01:20 PM
|
BLD-Framing/Rough-in | 4/26/2001 | 4/27/2001 | 4/27/2001 | A | PASS |
Jim Sly
|
|
|
###-####
|
BLD-Conference | 4/26/2001 | 4/26/2001 | 4/26/2001 | P | PASS |
Jim Sly
|
|
|
###-#### OK,d for insulation. 4/26/2001 6:08:24 PM
|
BLD-Conference | 4/12/2001 | 4/13/2001 | 4/13/2001 | A | PART |
Jim Sly
|
|
|
dave ###-#### Walk thru for frame...... 4/13/2001 12:03:46 PM
|
BLD-Conference | 4/5/2001 | 4/6/2001 | 4/6/2001 | A | PART |
Jim Sly
|
|
|
Dave ###-#### Need appr on revised TI floor plan....set up conf with Bob A and Jim Sly. 4/6/2001 10:10:49 AM
|
BLD-Conference | 10/10/2000 | 10/11/2000 | 10/11/2000 | A | PART |
Jim Sly
|
|
|
Matt Brizzee ###-#### 10/11/2000 9:41:30 AM Discussed 10/11/2000 11:20:37 AM Matt Brizzee ###-#### 10/11/2000 9:41:30 AM Discussed Basement Usable space. 10/11/2000 11:20:37 AM 10/11/2000 11:22:30 AM
|