BLD-Conference | 2/11/2002 | 2/11/2002 | 2/11/2002 | P | NR |
Carl Dependahl
|
|
|
Scheduled by Inspector: 340 On 2/11/2002 12:39:39 PM
|
BLD-Final | 5/24/2001 | 5/25/2001 | 5/25/2001 | P | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 05/24/2001 at 15:29:22. Contact: ###-####.
|
FIRE-Final Inspection | 5/23/2001 | 5/25/2001 | 5/25/2001 | A | PASS |
Rick Jackson
|
|
|
###-####
|
Permanent Occupancy | | 5/25/2001 | 5/25/2001 | | DONE |
|
|
|
|
FIRE-Final Inspection | 5/22/2001 | 5/23/2001 | 5/23/2001 | P | CANC |
Rick Jackson
|
|
|
###-####
|
FIRE-Final Inspection | 5/4/2001 | 5/4/2001 | 5/4/2001 | A | FAIL |
Rick Jackson
|
|
|
Added by Inspector: 409 On 5/4/2001 10:15:18 AM panic on exit door; battery backup for exit signs; address; chemical requirements for pool room unknown; occupant load sign
|
BLD-Energy code compliance | 1/12/2001 | 1/16/2001 | 1/16/2001 | A | PASS |
Russ Owen
|
|
|
Aaron ###-####
|
BLD-Energy code compliance | 1/12/2001 | 1/12/2001 | 1/12/2001 | P | PASS |
Steven Webb
|
|
|
Scheduled by Inspector: 420 On 1/12/2001 1:18:20 PM
|
BLD-Framing/Rough-in | 1/10/2001 | 1/11/2001 | 1/11/2001 | P | FAIL |
Steven Webb
|
|
|
###-####: Air seal package incomplete, need mechanical & electrical inspections. Prior c/n items completed regarding hd retrofit. 1/11/2001 3:04:40 PM
|
BLD-Framing/Rough-in | 12/11/2000 | 12/11/2000 | 12/11/2000 | P | FAIL |
Tom Arcoraci
|
|
|
Erin ###-#### ok to side see cn 12/11/2000 4:10:15 PM
|
BLD-Footing | 9/19/2000 | 9/19/2000 | 9/19/2000 | P | NR |
Russ Owen
|
|
|
FT INSP -DANE ###-####
|
BLD-Foundation | 9/15/2000 | 9/18/2000 | 9/18/2000 | A | PASS |
Russ Owen
|
|
|
DANE ###-#### FOUND WALL
|
BLD-Footing | 9/15/2000 | 9/15/2000 | 9/15/2000 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 09/15/2000 at 05:20:41. Contact: ###-####. 9/15/2000 11:55:48 AM 9/15/2000 11:56:04 AM
|