Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD00-01702
StatusFinaled
Name CAPITOL BUILDING CO LLC
Site Address 14495 W BATTENBERG DR
Project Name 
Customer Number939-5558
ePlanReviewNo
Description
To construct a 3031 sq. ft. two story single family dwelling (1346 sq. ft. first floor/1685 sq. ft. second floor) with a attached 780 sq. ft. three car garage and a 296 sq. ft. covered front porch. Per approved plans and requirement list. This is a solar and shade restricted lot. PC#538 (SAM)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/4/200012/5/200012/5/2000APASS
DetailsJim Sly
0071 garage code \\\ ###-#### C/C issued. 12/5/2000 11:12:28 AM
BLD-Framing/Rough-in9/22/20009/25/20009/25/2000APASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 09/22/2000 at 13:25:00. Contact: ###-####. Energy....OK 9/25/2000 8:30:32 AM
BLD-Wall cover9/22/20009/25/20009/25/2000PPASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 09/22/2000 at 13:26:46. Contact: ###-####.
BLD-Framing/Rough-in9/21/20009/22/20009/22/2000AFAIL
DetailsJim Sly
Scheduled by a contractor via Hello! on 09/21/2000 at 12:24:41. Contact: ###-####.
BLD-Wall cover9/19/20009/20/20009/20/2000AFAIL
DetailsAlan Hauser
Scheduled by a contractor via Hello! on 09/19/2000 at 13:44:33. Contact: ###-####.
BLD-Foundation9/18/20009/18/20009/18/2000PFAIL
DetailsJim Sly
###-#### Should be Electr for UFER (retro) ground. 9/18/2000 1:36:40 PM
BLD-Framing/Rough-in9/15/20009/18/20009/18/2000PFAIL
DetailsJim Sly
Scheduled by a contractor via Hello! on 09/15/2000 at 17:05:37. Contact: ###-####. C/N....issued 9/18/2000 1:29:36 PM
BLD-Framing/Rough-in9/6/20009/7/20009/7/2000APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 09/06/2000 at 11:55:21. Contact: ###-####. C/N still pend on shear insp. 9/7/2000 10:29:29 AM
BLD-Framing/Rough-in9/5/20009/5/20009/5/2000PPART
DetailsJim Sly
shear jason ###-#### Shear OK except block Gar shear panels 9/5/2000 2:03:38 PM
BLD-Framing/Rough-in8/30/20008/31/20008/31/2000AFAIL
DetailsJim Sly
Jason ###-#### shear insp C/N issued for shear 8/31/2000 10:34:32 AM
BLD-Framing/Rough-in8/9/20008/11/20008/11/2000AFAIL
DetailsJim Sly
Scheduled by a contractor via Hello! on 08/09/2000 at 16:35:30. Contact: ###-####. NR 8/11/2000 9:37:06 AM
BLD-Foundation7/17/20007/17/20007/17/2000PPART
DetailsAlan Hauser
Scheduled by a contractor via Hello! on 07/17/2000 at 07:04:32. Contact: ###-####.
BLD-Foundation7/13/20007/14/20007/13/2000PCANC
DetailsAlan Hauser
Scheduled by a contractor via Hello! on 07/13/2000 at 09:15:23. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 07/13/2000 at 22:59:52.
BLD-Footing7/13/20007/13/20007/13/2000PFAIL
Details
Scheduled by Inspector: 338 On 7/13/2000 lot cleaned off but no forms or r-bar is placed approved plans are on site 7/13/2000 4:41:08 PM
BLD-Footing7/13/20007/13/20007/13/2000PCANC
DetailsTony Young
Scheduled by a contractor via Hello! on 07/13/2000 at 09:14:51. Contact: ###-####. Perry took care of this 7/14/00 8:55:38 AM
BLD-Footing7/11/20007/11/20007/11/2000PFAIL
Details
Scheduled by a contractor via Hello! on 07/11/2000 at 11:19:11. Contact: ###-####. no forms set still organics above grade in the excavation; c/n issued recall with forms, reinforcing placed and approvad plans on site 7/11/00 12:53:38 PM contact # is no longer in service 7/11/00 12:55:00 PM