BLD-Conference | 4/30/2001 | 4/30/2001 | 4/30/2001 | P | PASS |
Tony Young
|
|
|
4/30/2001 9:10:13 AM
c ofc #20248 issued 4/30/2001 9:14:33 AM
|
BLD-Grading Inspection | 4/26/2001 | 4/26/2001 | 4/26/2001 | | PASS |
Rita DeYoung
|
|
|
Final grading complete according to approved plan.
|
BLD-Final | 4/17/2001 | 4/18/2001 | 4/18/2001 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 04/17/2001 at 16:08:37. Contact: .
need p/w sign off, all else is ok for c of c 4/18/2001 3:37:40 PM
|
BLD-Final | 4/18/2001 | 4/18/2001 | 4/18/2001 | P | PART |
Tony Young
|
|
|
4/18/2001 3:38:09 PM
|
FIRE-Final Inspection | 3/29/2001 | 3/29/2001 | 3/29/2001 | P | PASS |
Rick Jackson
|
|
|
Added by Inspector: 409 On 3/29/2001 3:31:23 PM
|
FIRE-Sprinkler Rough-in | 2/27/2001 | 2/27/2001 | 2/27/2001 | P | PASS |
Rick Jackson
|
|
|
Added by Inspector: 409 On 2/27/2001 2:59:33 PM okay to cover
|
BLD-Conference | 1/4/2001 | 1/5/2001 | 1/5/2001 | A | PASS |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 01/04/2001 at 10:47:31. Contact: . w/ bldr re handrails 1/5/2001 12:07:57 PM
|
FIRE-Conference | 1/5/2001 | 1/5/2001 | 1/5/2001 | P | PART |
Rick Jackson
|
|
|
Scheduled by Inspector: 409 On 1/5/2001 12:13:53 PM left correction notice at house requiring sprinklers; caled GC at around 12:00 today and notified him of the sprinkler requirement. Referred him to Plan Review when he asked why it went through plan without the requirement for sprinklers 1/5/2001 2:49:11 PM
|
BLD-Energy code compliance | 11/27/2000 | 11/28/2000 | 11/28/2000 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 11/27/2000 at 16:07:27. Contact: .ok to cover. 11/28/2000 9:12:31 AM
|
BLD-Framing/Rough-in | 11/24/2000 | 11/24/2000 | 11/24/2000 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 11/24/2000 at 08:03:20. Contact: .
ok to insulate 11/24/2000 12:19:17 PM
|
BLD-Framing/Rough-in | 11/21/2000 | 11/22/2000 | 11/22/2000 | P | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 11/21/2000 at 11:40:26. Contact: .
c/n posted 11/22/2000 2:25:19 PM
|
BLD-Wall cover | 11/10/2000 | 11/13/2000 | 11/13/2000 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 11/10/2000 at 08:26:59. Contact: .\\ exterior shear ok 11/16/2000 8:31:50 AM
|
BLD-Foundation | 8/31/2000 | 9/1/2000 | 9/1/2000 | A | PART |
Tony Young
|
|
|
rick--###-#### found wall insp
wip,,, looks ok w/ verbal corrections 9/1/2000 12:32:24 PM
|
BLD-Footing | 8/23/2000 | 8/24/2000 | 8/24/2000 | A | PART |
Tony Young
|
|
|
RICK--###-#### CELL FT
ok to put #5 rebar pins on footing surface slopes greater than 1/10 per Darrin @ Atwood-H-Jones (6" dowell imbedment w/ caulking around top). Work in progress, looks ok. 8/24/2000 12:16:35 PM
|
BLD-Footing | 8/21/2000 | 8/22/2000 | 8/22/2000 | A | NR |
Tony Young
|
|
|
Scheduled by Inspector: 415 On 8/21/2000 ###-####
conference on stepped footings, bedrock, messed up hole. 8/22/2000 11:26:18 AM
|
BLD-Footing | 8/21/2000 | 8/22/2000 | 8/22/2000 | P | NR |
Tony Young
|
|
|
###-####
|
BLD-Footing | 8/21/2000 | 8/21/2000 | 8/21/2000 | P | NR |
Tony Young
|
|
|
###-####
|
BLD-Footing | 8/16/2000 | 8/16/2000 | 8/16/2000 | | PASS |
|
|
|
Engineer has approved subgrade beneath footing and footing inspection can be done.
|