BLD-Final | 10/22/2003 | 10/23/2003 | 10/23/2003 | P | PASS |
Dave Hannah
|
|
|
joe; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Conference | 6/16/2003 | 6/17/2003 | 6/17/2003 | P | DONE |
Steven Webb
|
|
|
JOE; Phone #: ###-#### Internet Inspection Request from: Darla Downs Reviewed misc. items with owner in regards to being able to final permit. Extension of permit requested. 6/17/2003 3:41:50 PM
|
BLD-Conference | 12/4/2002 | 12/5/2002 | 12/5/2002 | A | PASS |
Carl Dependahl
|
|
|
extension for permit only ###-#### please call...homeowner...WIP should be done w/i 6 mos. 12/5/2002 9:15:31 AM
|
BLD-Conference | 6/7/2002 | 6/10/2002 | 6/10/2002 | P | PASS |
Carl Dependahl
|
|
|
renewal- joe- ###-####
|
BLD-Conference | 6/10/2002 | 6/10/2002 | 6/10/2002 | P | CANC |
Carl Dependahl
|
|
|
###-####
|
Extend Permit 180 days | | 3/28/2002 | 3/28/2002 | | DONE |
|
|
|
permit extended
|
BLD-Energy code compliance | 9/14/2001 | 9/17/2001 | 9/17/2001 | A | PASS |
Tony Young
|
|
|
###-#### joe
c/n made ok also 9/17/2001 11:09:15 AM
|
BLD-Framing/Rough-in | 8/20/2001 | 8/21/2001 | 8/21/2001 | P | FAIL |
Tony Young
|
|
|
###-#### joe
c/n posted, ok to insulate 8/21/2001 3:04:54 PM
|
BLD-Framing/Rough-in | 5/22/2001 | 5/22/2001 | 5/22/2001 | P | NR |
Dave Hannah
|
|
|
Braun ###-#### need mec,plumbing,elec rough ins 5/22/2001 3:13:34 PM
|
Extend Permit 180 days | | 5/18/2001 | 5/18/2001 | | DONE |
|
|
|
homeowner requested extension based on the fact that he was not aware it would ever expire before the job was done.
|
BLD-Conference | 10/3/2000 | 10/3/2000 | 10/3/2000 | P | NH |
Tom Arcoraci
|
|
|
###-#### no accessnoone home no ans on phone 10/3/2000 2:58:15 PM
|
BLD-Conference | 9/15/2000 | 9/18/2000 | 9/18/2000 | A | NH |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 09/15/2000 at 11:53:21. Contact: ###-####.
|
BLD-Framing/Rough-in | 9/6/2000 | 9/7/2000 | 9/7/2000 | A | NR |
Tony Young
|
|
|
###-####
|
BLD-Framing/Rough-in | 9/7/2000 | 9/7/2000 | 9/7/2000 | P | PART |
Tony Young
|
|
|
Scheduled by Inspector: 415 On 9/7/2000 shear wall
outside shearwall ok w/ verbal corrections 9/8/2000 10:57:43 AM
|
BLD-Conference | 8/15/2000 | 8/15/2000 | 8/15/2000 | P | PART |
|
|
|
JOE -- ###-#### CONF q,s on the new beam over existing house 8/16/2000 3:31:33 PM
|
BLD-Foundation | 7/18/2000 | 7/19/2000 | 7/19/2000 | A | PASS |
|
|
|
Scheduled by a contractor via Hello! on 07/18/2000 at 15:29:19. Contact: 86131000.
|
BLD-Footing | 7/12/2000 | 7/12/2000 | 7/12/2000 | P | PART |
|
|
|
###-#### setbacks appear ok 7/13/2000 12:16:22 PM
|