BLD-Final | 12/11/2000 | 12/12/2000 | 12/12/2000 | A | PASS |
Carl Dependahl
|
|
|
rob ###-#### l/c issued 12/12/2000 10:00:36 AM
|
BLD-Framing/Rough-in | 9/26/2000 | 9/26/2000 | 9/26/2000 | P | PASS |
Jim Storey
|
|
|
###-#### framing and insulation ok for cover. 9/26/2000 4:10:06 PM
|
BLD-Framing/Rough-in | 9/21/2000 | 9/22/2000 | 9/22/2000 | A | FAIL |
Jim Storey
|
|
|
JEFF ###-#### FR c/n fbi joist cut /sealents not applied at framing insp. / rim joist at stair wall not accessable to insulate exterior wall/ return air duct 2 nd floor exterior wall cavity not insulated/ under stair fur out needs fire blk. and backer to get 5/8 gyp atchment for stair protection./do not insulate with out reinspection. 9/22/2000 10:23:00 AM
|
BLD-Framing/Rough-in | 9/13/2000 | 9/13/2000 | 9/13/2000 | P | PART |
|
|
|
JEFF-- ###-#### SHEAR WALL shearnailing only 9/13/2000 2:21:19 PM
|
BLD-Foundation | 8/16/2000 | 8/17/2000 | 8/17/2000 | A | PART |
|
|
|
Tony ###-####
|
BLD-Foundation | 8/16/2000 | 8/16/2000 | 8/16/2000 | P | PASS |
|
|
|
JEFF-- ###-#### FOUND INSP ok to pour footer 8/17/2000 9:38:22 AM
|