Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD00-01772
StatusFinaled
Name STOEL RIVES, ATTORNEYS LLP
Site Address 101 S CAPITOL BLVD Unit: 1900
Project NameUS BANK-19TH FLR
Customer Number 
ePlanReviewNo
Description
To remodel a file storage area of existing tenant space on the east side of the 19th floor per approved plans on file. Work to include removal of miscellaneous walls around file storage area and copier, and install new dropped soffit above files along inside wall and construct a new wall with door into copier room. NOTE: This building is fully fire sprinklered. (P.C.#492-00)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection2/24/20032/24/20032/24/2003 DONE
DetailsCarl Dependahl
elec ok'd 2/24/2003 11:03:47 AM
BLD-Final10/25/200210/25/200210/25/2002PCANC
DetailsTony Young
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
BLD-Final2/7/20012/8/20012/8/2001AFAIL
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 02/07/2001 at 14:57:58. Contact: ###-####....nr, need elec 2/8/2001 10:01:45 AM
BLD-Final2/7/20012/7/20012/7/2001PFAIL
DetailsCarl Dependahl
Added by Inspector: 340 On 2/7/2001 2:51:04 PM need elec...recall
FIRE-Final Inspection2/5/20012/6/20012/6/2001APASS
DetailsRick Jackson
###-####
BLD-Final2/2/20012/2/20012/2/2001PFAIL
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 02/02/2001 at 07:09:37. Contact: ###-####. nee 2/2/2001 5:02:30 PM fire 2/2/2001 5:02:35 PM
BLD-Framing/Rough-in10/16/200010/16/200010/16/2000PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/16/2000 at 06:41:19. Contact: ###-####. Scheduled by a contractor v ia Hello! on 10/16/2000 at 06:41:19. Contact: ###-####. 10/16/2000 3:24:51 PM
BLD-Framing/Rough-in9/25/20009/25/20009/25/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 09/25/2000 at 10:59:26. Contact: ###-####. need fire protection on strucral beam. 9/25/2000 5:20:34 PM
BLD-Framing/Rough-in9/20/20009/21/20009/21/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 09/20/2000 at 17:08:24. Contact: ###-####. primary beam must be patched for fire proofing removed. 9/21/2000 2:33:57 PM
BLD-Framing/Rough-in8/18/20008/21/20008/21/2000AFAIL
Details
Scheduled by a contractor via Hello! on 08/18/2000 at 09:50:51. Contact: ###-####.