BLD-Final | 9/11/2000 | 9/12/2000 | 9/12/2000 | A | PASS |
Jim Sly
|
|
|
John ###-####
|
BLD-Final | 9/1/2000 | 9/6/2000 | 9/6/2000 | P | FAIL |
Carl Dependahl
|
|
|
John ###-####; recall . 9/6/2000 5:55:36 PM
|
BLD-Energy code compliance | 7/28/2000 | 8/3/2000 | 8/3/2000 | P | PART |
Carl Dependahl
|
|
|
john-- ###-#### energy codeins ok, add cont blocks per eng'g 8/3/2000 2:22:53 PM
|
BLD-Framing/Rough-in | 7/28/2000 | 7/31/2000 | 7/31/2000 | A | FAIL |
Carl Dependahl
|
|
|
john--###-#### fr; complete eng'd blocking at hse/gar wall, air seal, etc. 7/31/2000 3:59:57 PM
|
BLD-Framing/Rough-in | 7/27/2000 | 7/28/2000 | 7/28/2000 | A | NR |
Jim Sly
|
|
|
JOHN--###-#### FR Done by 408 7/28/00 9:06:04 AM Not ready 7/28/00 11:50:56 AM
|
BLD-Framing/Rough-in | 7/24/2000 | 7/24/2000 | 7/24/2000 | P | PART |
Carl Dependahl
|
|
|
john ###-#### shear wall insp; need install truss blocking & shear 7/24/2000 4:45:20 PM wall per eng. OK to side 7/24/2000 4:45:48 PM
|
BLD-Foundation | 7/5/2000 | 7/5/2000 | 7/5/2000 | P | PART |
Tom Arcoraci
|
|
|
Ryan ###-####
|
BLD-Footing | 6/30/2000 | 6/30/2000 | 6/30/2000 | P | PART |
Carl Dependahl
|
|
|
eric ###-#### early start okay fig req'd across gar, front; mis-exacvated 7/6/00 8:21:32 AM
|