Permit Information
Permit NumberBLD00-01801
StatusFinaled
Name BOB HOSAC
Site Address 10259 W EMERALD ST
Project NameEMERALD BLDG D-SHELL
Customer Number 
ePlanReviewNo
Description
EMERALD BUILDING D * TO CONSTRUCT A NEW, SINGLE STORY, TYPE II-N, CONCRETE TILT UP, MULTI-TENANT, 25,500 SQ. FT. SHELL BUILDING. NOTE: THIS BUILDING IS FULLY FIRE SPRINKLERED FOR AREA INCREASE. ALL CONSTRUCTION PER THE APPROVED PLANS, ATTACHED COMMENT LIST, CABO/ANSI A117.1 AND THE 1997 EDITION OF THE UBC. THIS BUILDING IS A SHELL BUILDING ONLY A CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED UNDER THIS PERMIT. SEPARATE PERMITS AND CERTIFICATE OF OCCUPANCIES MUST BE OBTAINED, TO FINISH AND OCCUPY EACH TENANT SPACE. UBC SECTION 104.2.8 USED FOR THE RECESSED GLAZING IN THE EXTERIOR WALL OPENING PROTECTION ON SOUTH WALL, INSTALLATION OF FIRE SRPINKLERS IN EXTERIOR ONE-HOUR SOFFIT. GRADING PERMIT BLD00-02313 MJP
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/19/20014/20/20014/20/2001PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 04/19/2001 at 12:49:54. Contact: ###-####. ok for perm final letter from spec insp and eng received 4/20/2001 1:42:33 PM
BLD-Final3/15/20013/16/20013/16/2001APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 03/15/2001 at 14:07:34. Contact: ###-####. Temp Occ C/N.....Perm Occ status req within 90 days of this notice. 3/16/2001 11:56:49 AM
FIRE-Final Inspection3/14/20013/15/20013/15/2001PPASS
DetailsJoe Tawney
Reinsp OK for certificate of completion 3/16/2001 8:20:34 AM
BLD-Conference2/28/20012/28/20012/28/2001ACANC
DetailsLee Rice
Scheduled by Inspector: 309 On 2/28/2001 9:32:46 AM
BLD-Final2/27/20012/28/20012/28/2001PNR
DetailsRuss Owen
Scheduled by a contractor via Hello! on 02/27/2001 at 14:11:32. Contact: ###-####.
FIRE-Final Inspection2/27/20012/28/20012/28/2001AFAIL
DetailsJoe Tawney
Final Fail C/N issued 2/28/2001 1:51:40 PM
FIRE-Conference11/20/200011/20/200011/20/2000PPART
DetailsRick Jackson
###-####/////discussed requirements to sign-off the shell: sprinkler monitoring and alarms; heat to maintain above 40 degrees 11/21/2000 10:13:15 AM
FIRE-Sprinkler Rough-in11/16/200011/17/200011/17/2000PCANC
DetailsJoe Tawney
Cancel to be resched 11/17/2000 7:23:00 PM
BLD-Concrete9/27/20009/27/20009/27/2000APART
DetailsCarl Dependahl
Added by Inspector: 340 On 9/27/2000 sub-ftgs, ok pend reports
BLD-Footing8/24/20008/25/20008/25/2000APART
DetailsTom Arcoraci
###-#### 10 o'clock poor
BLD-Conference8/23/20008/24/20008/24/2000APASS
DetailsCarl Dependahl
mike ###-####