BLD-Final | 4/19/2001 | 4/20/2001 | 4/20/2001 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 04/19/2001 at 12:49:54. Contact: ###-####. ok for perm final letter from spec insp and eng received 4/20/2001 1:42:33 PM
|
BLD-Final | 3/15/2001 | 3/16/2001 | 3/16/2001 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 03/15/2001 at 14:07:34. Contact: ###-####. Temp Occ C/N.....Perm Occ status req within 90 days of this notice. 3/16/2001 11:56:49 AM
|
FIRE-Final Inspection | 3/14/2001 | 3/15/2001 | 3/15/2001 | P | PASS |
Joe Tawney
|
|
|
Reinsp OK for certificate of completion 3/16/2001 8:20:34 AM
|
BLD-Conference | 2/28/2001 | 2/28/2001 | 2/28/2001 | A | CANC |
Lee Rice
|
|
|
Scheduled by Inspector: 309 On 2/28/2001 9:32:46 AM
|
BLD-Final | 2/27/2001 | 2/28/2001 | 2/28/2001 | P | NR |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 02/27/2001 at 14:11:32. Contact: ###-####.
|
FIRE-Final Inspection | 2/27/2001 | 2/28/2001 | 2/28/2001 | A | FAIL |
Joe Tawney
|
|
|
Final Fail C/N issued 2/28/2001 1:51:40 PM
|
FIRE-Conference | 11/20/2000 | 11/20/2000 | 11/20/2000 | P | PART |
Rick Jackson
|
|
|
###-####/////discussed requirements to sign-off the shell: sprinkler monitoring and alarms; heat to maintain above 40 degrees 11/21/2000 10:13:15 AM
|
FIRE-Sprinkler Rough-in | 11/16/2000 | 11/17/2000 | 11/17/2000 | P | CANC |
Joe Tawney
|
|
|
Cancel to be resched 11/17/2000 7:23:00 PM
|
BLD-Concrete | 9/27/2000 | 9/27/2000 | 9/27/2000 | A | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 9/27/2000 sub-ftgs, ok pend reports
|
BLD-Footing | 8/24/2000 | 8/25/2000 | 8/25/2000 | A | PART |
Tom Arcoraci
|
|
|
###-#### 10 o'clock poor
|
BLD-Conference | 8/23/2000 | 8/24/2000 | 8/24/2000 | A | PASS |
Carl Dependahl
|
|
|
mike ###-####
|