BLD-Final | 10/26/2000 | 10/26/2000 | 10/26/2000 | P | PASS |
Dave Hannah
|
|
|
FN OCC ELLIOTT ###-####
|
BLD-Energy code compliance | 8/25/2000 | 8/25/2000 | 8/25/2000 | P | PASS |
Jim Sly
|
|
|
elliott--###-#### insulation
|
BLD-Framing/Rough-in | 8/22/2000 | 8/23/2000 | 8/23/2000 | A | PASS |
Jim Sly
|
|
|
Elliot ###-####
|
BLD-Framing/Rough-in | 8/7/2000 | 8/8/2000 | 8/8/2000 | A | PART |
Jim Sly
|
|
|
shear reinspection ###-#### shear reinspection OK to side C/N...Gar retro HD. 8/8/2000 11:40:31 AM
|
BLD-Framing/Rough-in | 8/2/2000 | 8/2/2000 | 8/2/2000 | P | PART |
Jim Sly
|
|
|
SHEAR WALL INSP--ELLIOTT-- ###-#### FR C/N for shear...Nailing appears OK. 8/2/2000 2:15:16 PM
|
BLD-Footing | 7/6/2000 | 7/7/2000 | 7/7/2000 | A | PART |
Tom Arcoraci
|
|
|
DAve ###-#### DWI 7/7/00 1:49:15 PM
|