BLD-Final | 2/22/2001 | 2/23/2001 | 2/23/2001 | A | PASS |
Jim Storey
|
|
|
Jean ###-#### call before going out he has info you need fianl ok 2/23/2001 8:57:53 AM
|
Permanent Occupancy | | 2/23/2001 | 2/23/2001 | | DONE |
|
|
|
|
BLD-Final | 2/9/2001 | 2/9/2001 | 2/9/2001 | A | FAIL |
Jim Storey
|
|
|
Final, reinspect (I have the card) partions over 6 ft laderal design req. 2/12/2001 9:16:10 AM
|
FIRE-Final Inspection | 10/3/2000 | 10/4/2000 | 10/4/2000 | A | PASS |
Rick Jackson
|
|
|
Scheduled by Inspector: 409 On 10/3/2000 signed perm for fire; signed for Jim Storey on temp pending final for electrical 10/4/2000 9:17:57 AM
|
BLD-Framing/Rough-in | 10/2/2000 | 10/2/2000 | 10/2/2000 | P | PART |
Jim Storey
|
|
|
###-#### final insp temp ok upon sign off from fire. 10/2/2000 2:08:54 PM
|
FIRE-Final Inspection | 10/2/2000 | 10/2/2000 | 10/2/2000 | P | NR |
Rick Jackson
|
|
|
CALL FIRST ###-#### TEMP OCC will call again to rescheule 10/3/2000 4:23:01 PM
|
FIRE-Final Inspection | 9/29/2000 | 9/29/2000 | 10/2/2000 | P | FAIL |
Rick Jackson
|
|
|
###-#### need to install fire sprinkler head in closet; remote LED's for duct detectors 10/2/2000 10:11:31 AM
|
BLD-Final | 9/29/2000 | 9/29/2000 | 9/29/2000 | P | CANC |
Jim Storey
|
|
|
###-####
|
BLD-Framing/Rough-in | 9/26/2000 | 9/26/2000 | 9/26/2000 | P | PART |
Jim Storey
|
|
|
ceiling grid Gene ###-#### suite 700ceilling ok pending mech approval for gas piping. 9/26/2000 5:26:54 PM
|
BLD-Framing/Rough-in | 9/21/2000 | 9/22/2000 | 9/22/2000 | P | CANC |
Jim Storey
|
|
|
ceiling grid Gene ###-#### late pm
|
BLD-Framing/Rough-in | 8/30/2000 | 8/30/2000 | 8/30/2000 | P | PASS |
Jim Storey
|
|
|
Unit 700 Gene ###-####
|
BLD-Framing/Rough-in | 8/14/2000 | 8/15/2000 | 8/15/2000 | A | PART |
Jim Storey
|
|
|
Gene ###-#### please call in before you go out pending plm. ok to rock new walls . w/others approvals. 8/15/2000 9:00:17 AM
|