BLD-Final | 1/10/2001 | 1/11/2001 | 1/11/2001 | A | PASS |
Tom Arcoraci
|
|
|
Contact Jim @ ###-#### ok for perm after zoning signs 1/11/2001 11:38:22 AM
|
FIRE-Final Inspection | 1/4/2001 | 1/5/2001 | 1/5/2001 | A | PASS |
Joe Tawney
|
|
|
###-####. 1/5/2001 8:20:57 AM
|
BLD-Framing/Rough-in | 11/17/2000 | 11/17/2000 | 11/17/2000 | P | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 11/17/2000 at 09:03:17. Contact: ###-####. Final not framing. 11/17/2000 2:19:43 PM
|
BLD-Framing/Rough-in | 8/28/2000 | 8/29/2000 | 8/29/2000 | P | PART |
Carl Dependahl
|
|
|
JIM-- ###-#### FR INSP ok to roof at soffit 8/29/2000 12:51:35 PM
|
BLD-Framing/Rough-in | 8/28/2000 | 8/28/2000 | 8/28/2000 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 8/28/2000 W/ BLDR RE FRAME INSP, SOFFIT OK.
|
BLD-Conference | 8/18/2000 | 8/18/2000 | 8/18/2000 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 8/18/2000 w/ bldr re parapet const.
|
BLD-Framing/Rough-in | 8/18/2000 | 8/18/2000 | 8/18/2000 | P | PART |
Carl Dependahl
|
|
|
Jim ###-####; wip ok to continue 8/18/2000 4:11:12 PM
|