BLD-Final | 9/29/2000 | 10/2/2000 | 10/2/2000 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 09/29/2000 at 17:45:05. Contact: ###-####.
temp. occ. ok until plumbing final occ. is granted then ok for final occupancy. 10/2/2000 4:40:40 PM
|
FIRE-Final Inspection | 9/29/2000 | 10/2/2000 | 10/2/2000 | A | FAIL |
Joe Tawney
|
|
|
###-####.Reinsp Fail Fire ext Hand rails 10/2/2000 12:23:01 PM
|
Permanent Occupancy | | 10/2/2000 | 10/2/2000 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 9/27/2000 | 9/28/2000 | 9/28/2000 | P | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 09/27/2000 at 17:40:34. Contact: ###-####.
ceiling grid ,, c/n posted 9/28/2000 2:13:30 PM
|
BLD-Wall cover | 9/27/2000 | 9/28/2000 | 9/28/2000 | A | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 09/27/2000 at 08:02:35. Contact: ###-####.
|
FIRE-Final Inspection | 9/28/2000 | 9/28/2000 | 9/28/2000 | P | FAIL |
Joe Tawney
|
|
|
###-#### Fail C/N issued 9/29/2000 7:58:17 AM
|
BLD-Framing/Rough-in | 9/27/2000 | 9/27/2000 | 9/27/2000 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 09/27/2000 at 08:00:37. Contact: ###-####.
ok to sheetrock demising wall 9/27/2000 4:43:53 PM
|
BLD-Framing/Rough-in | 9/25/2000 | 9/26/2000 | 9/26/2000 | A | FAIL |
Tony Young
|
|
|
fr insp jim ###-####
c/n posted,, draft stops, ceiling grid supports 9/26/2000 9:58:49 AM
|
BLD-Framing/Rough-in | 9/8/2000 | 9/11/2000 | 9/11/2000 | P | PART |
Tony Young
|
|
|
Jim ###-####
ok to insulate and sheetrock int. walls,,, need elec. sign off on bathroom 9/11/2000 2:12:56 PM
|
BLD-Framing/Rough-in | 9/8/2000 | 9/8/2000 | 9/8/2000 | P | NR |
Tony Young
|
|
|
Jim ###-####
need trade signoff 9/8/2000 1:05:48 PM
|
BLD-Energy code compliance | 8/31/2000 | 9/1/2000 | 9/1/2000 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 08/31/2000 at 13:10:33. Contact: ###-####.
inspection on deck platform, ok to cover w/ modifications 9/1/2000 9:08:34 AM
|