Permit Information
Permit NumberBLD00-01953
StatusFinaled
Name PLANTATION PLAZA (BLDG B)
Site Address 5616 W STATE ST
Project NamePLANTATION PLAZA BLDG B
Customer Number 
ePlanReviewNo
Description
PLANTATION PLAZA BUILDING B * TO CONSTRUCT A NEW 17,975 SQ. FT., ONE STORY RETAIL/OFFICE SHELL BUILDING AND RELATED SITE IMPROVEMENTS. THIS BUILDING IS CONSTRUCTED OF MASONRY EXTERIOR WALLS AND INTERIOR AND ROOF STEEL STRUCTURAL FRAME. THIS BUILDING IS FULLY FIRE SPRINKLED. THE SPRINKLERS ARE BEING USED FOR AREA INCREASE. ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED COMMENT LIST. THIS IS A SHELL PERMIT ONLY; THERE IS NO OCCUPANCY ALLOWED UNDER THIS PERMIT. SEPARATE TENANT IMPROVEMENTS ARE REQUIRED TO FINISH THIS BUILDING FOR OCCUPANCY. PC#529-00/DRH00-00074/JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection2/14/20032/14/20032/14/2003 PASS
DetailsTony Young
final ok 2/21/2003 3:02:01 PM
BLD-Final3/6/20013/7/20013/7/2001APASS
DetailsTony Young
Scheduled by a contractor via Hello! on 03/06/2001 at 11:00:12. Contact: ###-####.
shell only on B building, ok w/ other trades signed off 3/7/2001 11:15:19 AM
FIRE-Final Inspection2/23/20012/26/20012/26/2001APASS
DetailsJoe Tawney
###-#### ###-#### Reinsp OK for certificate of completion 2/26/2001 12:55:51 PM
FIRE-Final Inspection2/22/20012/23/20012/23/2001ACANC
DetailsJoe Tawney
RICHARD ###-#### Cancel not ready 2/23/2001 12:02:03 PM
FIRE-Final Inspection2/21/20012/22/20012/22/2001AFAIL
DetailsJoe Tawney
Reinsp Fail C/N items not corrected 2/22/2001 12:32:09 PM
BLD-Framing/Rough-in12/28/200012/29/200012/29/2000APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 12/28/2000 at 15:23:41. Contact: ###-####. wip red heads installed 6 ft on center at canopy 12/29/2000 9:16:32 AM
BLD-Framing/Rough-in12/27/200012/27/200012/27/2000PFAIL
DetailsTony Young
Scheduled by Inspector: 415 On 12/27/2000 9:32:15 AM
waiting for letter and drawings from arch. and eng. on as built. Not to plan now. 12/27/2000 3:17:50 PM
BLD-Framing/Rough-in12/21/200012/22/200012/22/2000PNR
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 12/21/2000 at 16:03:32. Contact: ###-####. no one at site no plans 12/22/2000 3:02:13 PM
BLD-Framing/Rough-in12/21/200012/21/200012/21/2000PNR
DetailsTony Young
Scheduled by Inspector: 415 On 12/21/2000 10:41:33 AM
conf. only, need trades signed off 12/21/2000 2:35:03 PM
BLD-Framing/Rough-in12/19/200012/20/200012/20/2000PCANC
DetailsTony Young
Scheduled by a contractor via Hello! on 12/19/2000 at 13:11:15. Contact: ###-####.
BLD-Framing/Rough-in10/25/200010/26/200010/26/2000PCANC
DetailsTony Young
Scheduled by Inspector: 415 On 10/25/2000 ceiling grid reinspection, brian ###-####
wrong bp # 10/26/2000 3:02:06 PM
BLD-Other10/25/200010/26/200010/26/2000APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 10/25/2000 at 10:08:50. Contact: ###-####. wip spec insp on site 10/26/2000 11:02:34 AM
BLD-Other10/16/200010/17/200010/17/2000APART
DetailsTony Young
Scheduled by a contractor via Hello! on 10/16/2000 at 20:36:19. Contact: ###-####.
4 FT. GROUT POUR, SPECIAL LOOKED AT, PENDING REPORT 10/17/2000 3:40:33 PM
BLD-Footing10/2/200010/2/200010/2/2000PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 10/02/2000 at 09:36:50. Contact: ###-####.
ok ,, work in progress,, special to be on job 10/2/2000 1:49:14 PM
BLD-Footing9/29/20009/29/20009/29/2000PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 09/29/2000 at 07:29:41. Contact: ###-####.
special on job 9/29/2000 4:44:12 PM
BLD-Footing9/28/20009/28/20009/28/2000PCANC
DetailsTony Young
Scheduled by a contractor via Hello! on 09/28/2000 at 07:38:04. Contact: ###-####.
BLD-Footing9/26/20009/27/20009/27/2000APART
DetailsTony Young
Scheduled by a contractor via Hello! on 09/26/2000 at 12:17:52. Contact: ###-####.
s/w section of stem wall and 4 front pier pads,, on east on main bldg. ,, subject to special inspection approval 9/27/2000 10:23:57 AM
BLD-Foundation9/22/20009/25/20009/25/2000PPART
DetailsTony Young
###-####
special on job,,, ok 9/25/2000 4:14:29 PM
BLD-Footing9/21/20009/22/20009/22/2000AFAIL
DetailsAlan Hauser
trailer locked no access to plans 9/22/2000 12:03:34 PM
BLD-Footing9/20/20009/21/20009/21/2000APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 09/20/2000 at 12:35:46. Contact: ###-####. Foot OK pend. special insp and approvals. 9/21/2000 9:40:02 AM
BLD-Footing9/14/20009/15/20009/15/2000PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 09/14/2000 at 15:51:56. Contact: ###-####.
special inspector will be on job for pour, rebar placement,,, 9/15/2000 1:08:10 PM
BLD-Footing9/13/20009/14/20009/14/2000AFAIL
DetailsTony Young
Scheduled by Inspector: 415 On 9/13/2000 reinspect
c/n posted,,soil eng. needed 9/14/2000 10:14:01 AM
BLD-Footing9/12/20009/13/20009/13/2000PFAIL
DetailsTony Young
Scheduled by a contractor via Hello! on 09/12/2000 at 15:59:26. Contact: ###-####.
conf. w/ B. A. and G.S. and special from westech and super. richard reese on what is reqd. on 9-14-00 9/14/2000 10:18:44 AM
BLD-Footing9/11/20009/12/20009/12/2000PNR
DetailsTony Young
REBAR INSP--BRANTLEY-- ###-####