BLD-Aging Inspection | 2/14/2003 | 2/14/2003 | 2/14/2003 | | PASS |
Tony Young
|
|
|
final ok 2/21/2003 3:02:01 PM
|
BLD-Final | 3/6/2001 | 3/7/2001 | 3/7/2001 | A | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 03/06/2001 at 11:00:12. Contact: ###-####.
shell only on B building, ok w/ other trades signed off 3/7/2001 11:15:19 AM
|
FIRE-Final Inspection | 2/23/2001 | 2/26/2001 | 2/26/2001 | A | PASS |
Joe Tawney
|
|
|
###-#### ###-#### Reinsp OK for certificate of completion 2/26/2001 12:55:51 PM
|
FIRE-Final Inspection | 2/22/2001 | 2/23/2001 | 2/23/2001 | A | CANC |
Joe Tawney
|
|
|
RICHARD ###-#### Cancel not ready 2/23/2001 12:02:03 PM
|
FIRE-Final Inspection | 2/21/2001 | 2/22/2001 | 2/22/2001 | A | FAIL |
Joe Tawney
|
|
|
Reinsp Fail C/N items not corrected 2/22/2001 12:32:09 PM
|
BLD-Framing/Rough-in | 12/28/2000 | 12/29/2000 | 12/29/2000 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 12/28/2000 at 15:23:41. Contact: ###-####. wip red heads installed 6 ft on center at canopy 12/29/2000 9:16:32 AM
|
BLD-Framing/Rough-in | 12/27/2000 | 12/27/2000 | 12/27/2000 | P | FAIL |
Tony Young
|
|
|
Scheduled by Inspector: 415 On 12/27/2000 9:32:15 AM
waiting for letter and drawings from arch. and eng. on as built. Not to plan now. 12/27/2000 3:17:50 PM
|
BLD-Framing/Rough-in | 12/21/2000 | 12/22/2000 | 12/22/2000 | P | NR |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 12/21/2000 at 16:03:32. Contact: ###-####. no one at site no plans 12/22/2000 3:02:13 PM
|
BLD-Framing/Rough-in | 12/21/2000 | 12/21/2000 | 12/21/2000 | P | NR |
Tony Young
|
|
|
Scheduled by Inspector: 415 On 12/21/2000 10:41:33 AM
conf. only, need trades signed off 12/21/2000 2:35:03 PM
|
BLD-Framing/Rough-in | 12/19/2000 | 12/20/2000 | 12/20/2000 | P | CANC |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 12/19/2000 at 13:11:15. Contact: ###-####.
|
BLD-Framing/Rough-in | 10/25/2000 | 10/26/2000 | 10/26/2000 | P | CANC |
Tony Young
|
|
|
Scheduled by Inspector: 415 On 10/25/2000 ceiling grid reinspection, brian ###-####
wrong bp # 10/26/2000 3:02:06 PM
|
BLD-Other | 10/25/2000 | 10/26/2000 | 10/26/2000 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/25/2000 at 10:08:50. Contact: ###-####. wip spec insp on site 10/26/2000 11:02:34 AM
|
BLD-Other | 10/16/2000 | 10/17/2000 | 10/17/2000 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 10/16/2000 at 20:36:19. Contact: ###-####.
4 FT. GROUT POUR, SPECIAL LOOKED AT, PENDING REPORT 10/17/2000 3:40:33 PM
|
BLD-Footing | 10/2/2000 | 10/2/2000 | 10/2/2000 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 10/02/2000 at 09:36:50. Contact: ###-####.
ok ,, work in progress,, special to be on job 10/2/2000 1:49:14 PM
|
BLD-Footing | 9/29/2000 | 9/29/2000 | 9/29/2000 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 09/29/2000 at 07:29:41. Contact: ###-####.
special on job 9/29/2000 4:44:12 PM
|
BLD-Footing | 9/28/2000 | 9/28/2000 | 9/28/2000 | P | CANC |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 09/28/2000 at 07:38:04. Contact: ###-####.
|
BLD-Footing | 9/26/2000 | 9/27/2000 | 9/27/2000 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 09/26/2000 at 12:17:52. Contact: ###-####.
s/w section of stem wall and 4 front pier pads,, on east on main bldg. ,, subject to special inspection approval 9/27/2000 10:23:57 AM
|
BLD-Foundation | 9/22/2000 | 9/25/2000 | 9/25/2000 | P | PART |
Tony Young
|
|
|
###-####
special on job,,, ok 9/25/2000 4:14:29 PM
|
BLD-Footing | 9/21/2000 | 9/22/2000 | 9/22/2000 | A | FAIL |
Alan Hauser
|
|
|
trailer locked no access to plans 9/22/2000 12:03:34 PM
|
BLD-Footing | 9/20/2000 | 9/21/2000 | 9/21/2000 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 09/20/2000 at 12:35:46. Contact: ###-####. Foot OK pend. special insp and approvals. 9/21/2000 9:40:02 AM
|
BLD-Footing | 9/14/2000 | 9/15/2000 | 9/15/2000 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 09/14/2000 at 15:51:56. Contact: ###-####.
special inspector will be on job for pour, rebar placement,,, 9/15/2000 1:08:10 PM
|
BLD-Footing | 9/13/2000 | 9/14/2000 | 9/14/2000 | A | FAIL |
Tony Young
|
|
|
Scheduled by Inspector: 415 On 9/13/2000 reinspect
c/n posted,,soil eng. needed 9/14/2000 10:14:01 AM
|
BLD-Footing | 9/12/2000 | 9/13/2000 | 9/13/2000 | P | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 09/12/2000 at 15:59:26. Contact: ###-####.
conf. w/ B. A. and G.S. and special from westech and super. richard reese on what is reqd. on 9-14-00 9/14/2000 10:18:44 AM
|
BLD-Footing | 9/11/2000 | 9/12/2000 | 9/12/2000 | P | NR |
Tony Young
|
|
|
REBAR INSP--BRANTLEY-- ###-####
|