BLD-Final | 2/20/2001 | 2/21/2001 | 2/21/2001 | A | PASS |
Jim Sly
|
|
|
lock box EBH \\###-#### C/C issued. 2/21/2001 11:20:44 AM
|
BLD-Energy code compliance | 9/21/2000 | 9/22/2000 | 9/22/2000 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 09/21/2000 at 14:31:52. Contact: ###-####.
|
BLD-Framing/Rough-in | 9/18/2000 | 9/19/2000 | 9/19/2000 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 09/18/2000 at 15:47:23. Contact: ###-####.
|
BLD-Framing/Rough-in | 9/6/2000 | 9/6/2000 | 9/6/2000 | P | PART |
Jim Sly
|
|
|
shear wall Debbie ###-#### shear OK 9/6/2000 1:13:18 PM
|
BLD-Footing | 8/21/2000 | 8/21/2000 | 8/21/2000 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 08/21/2000 at 08:21:01. Contact: ###-####.
|