BLD-Final | 5/7/2001 | 5/7/2001 | 5/7/2001 | P | PASS |
Russ Owen
|
|
|
shane ###-####ok perm oc. 12/7/2001 5:44:04 PM
|
Permanent Occupancy | | 5/7/2001 | 5/7/2001 | | DONE |
|
|
|
|
BLD-Final | 5/3/2001 | 5/3/2001 | 5/3/2001 | P | PART |
Russ Owen
|
|
|
###-#### shane oc temp oc. need special inspection final letter, perm oc from zoning&ele. 12/3/2001 5:19:22 PM
|
BLD-Final | 4/27/2001 | 4/27/2001 | 4/27/2001 | P | CANC |
Dave Hannah
|
|
|
fn occ shane-- ###-#### 4/27/2001 1:59:20 PM
|
BLD-Final | 4/27/2001 | 4/27/2001 | 4/27/2001 | A | PASS |
Joe Tawney
|
|
|
Added by Inspector: 406 On 4/27/2001 12:15:03 PM Final OK for permanant occupancy
|
BLD-Framing/Rough-in | 4/23/2001 | 4/23/2001 | 4/23/2001 | P | PASS |
Russ Owen
|
|
|
ceiling reinspection Shane ###-####
|
BLD-Framing/Rough-in | 4/11/2001 | 4/11/2001 | 4/11/2001 | P | PART |
Russ Owen
|
|
|
ceiling grid Shane ###-#### all comon grid ok ,need to support the prestige grid at the ends. 4/11/2001 2:20:13 PM
|
BLD-Framing/Rough-in | 3/2/2001 | 3/2/2001 | 3/2/2001 | P | NR |
Russ Owen
|
|
|
###-####
|
BLD-Framing/Rough-in | 2/2/2001 | 2/2/2001 | 2/2/2001 | P | PART |
Russ Owen
|
|
|
Added by Inspector: 407 On 2/2/2001 3:31:35 PM need fireblocking at front coluns.
|
BLD-Framing/Rough-in | 1/24/2001 | 1/24/2001 | 1/24/2001 | P | PART |
Russ Owen
|
|
|
###-#### partial insp ok will need to install the fire blocking at 10' height. at ext walls. 1/24/2001 4:47:31 PM
|
BLD-Framing/Rough-in | 1/18/2001 | 1/19/2001 | 1/19/2001 | A | PART |
Russ Owen
|
|
|
Shane ###-####walk thru of building. all const per plans at this time. 1/19/2001 10:50:09 AM
|
BLD-Framing/Rough-in | 1/10/2001 | 1/11/2001 | 1/11/2001 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 01/10/2001 at 14:08:52. Contact: ###-####.left shear wall only. 1/11/2001 12:27:33 PM
|
BLD-Framing/Rough-in | 1/4/2001 | 1/5/2001 | 1/5/2001 | A | NR |
Dave Hannah
|
|
|
SHANE 880/4519 FR
|
BLD-Framing/Rough-in | 1/3/2001 | 1/3/2001 | 1/3/2001 | P | PART |
Russ Owen
|
|
|
Shane ###-####ext wall pre- insp mis areas. 1/3/2001 4:25:41 PM
|
BLD-Framing/Rough-in | 11/30/2000 | 12/1/2000 | 12/1/2000 | P | CANC |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 11/30/2000 at 14:39:43. Contact: ###-####.
|
BLD-Concrete | 11/28/2000 | 11/29/2000 | 11/29/2000 | A | PART |
Russ Owen
|
|
|
###-####3rd lift cmu. 11/29/2000 11:41:41 AM
|
BLD-Concrete | 11/28/2000 | 11/29/2000 | 11/29/2000 | P | NR |
Russ Owen
|
|
|
###-####
|
BLD-Foundation | 11/27/2000 | 11/28/2000 | 11/28/2000 | A | PART |
Russ Owen
|
|
|
###-####
|
BLD-Foundation | 11/27/2000 | 11/28/2000 | 11/28/2000 | P | PART |
Russ Owen
|
|
|
FOUND WALL-- SHANE- ###-#### 2nd lift ext cmu wall ok to pour. 11/28/2000 5:22:01 PM
|
BLD-Footing | 11/9/2000 | 11/9/2000 | 11/9/2000 | P | PART |
Dave Hannah
|
|
|
FT INSP-- SHANE ###-####
|
BLD-Footing | 11/7/2000 | 11/8/2000 | 11/8/2000 | A | NR |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 11/07/2000 at 10:43:20. Contact: ###-####. ok pend sp insp re 11/7/2000 1:30:47 PM ort 11/7/2000 1:30:51 PM
|
BLD-Footing | 11/2/2000 | 11/3/2000 | 11/3/2000 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 11/02/2000 at 10:02:00. Contact: ###-####.mti onsite, pre-con meeting w/ super.no spec insp for masons 11/3/2000 3:14:10 PM
|
BLD-Conference | 8/16/2000 | 8/16/2000 | 8/16/2000 | P | CANC |
|
|
|
Scheduled by Inspector: 338 On 8/16/2000 just checking 8/17/2000 3:27:36 PM
|