BLD-Final | 9/21/2000 | 9/22/2000 | 9/22/2000 | A | PASS |
Jim Sly
|
|
|
MIKE ###-#### FN
|
BLD-Energy code compliance | 8/24/2000 | 8/24/2000 | 8/24/2000 | P | PASS |
Jim Sly
|
|
|
Michale Riggs; ###-#### frame pass 8/24/2000 2:32:36 PM
|
BLD-Framing/Rough-in | 8/22/2000 | 8/23/2000 | 8/23/2000 | P | PASS |
Jim Sly
|
|
|
###-####
|
BLD-Foundation | 7/26/2000 | 7/26/2000 | 7/26/2000 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 07/26/2000 at 06:49:11. Contact: .
|
BLD-Footing | 7/25/2000 | 7/25/2000 | 7/25/2000 | P | PART |
Jim Sly
|
|
|
###-####-JERRY FT No water line easement on stamped plot plan...Verify no easement...Foot appears OK. 7/25/00 3:00:15 PM
|