BLD-Final | 11/21/2000 | 11/21/2000 | 11/21/2000 | P | PASS |
Dave Hannah
|
|
|
FN PAT ###-#### CELL
|
BLD-Final | 11/16/2000 | 11/17/2000 | 11/17/2000 | A | PART |
Russ Owen
|
|
|
JERRY ###-#### . 11/17/2000 10:11:26 AM no ele or plm insp done i approved mec,and left a c/n for ele and plm otherwise no structural corrections, ok for co when above done. 11/17/2000 11:08:16 AM
|
BLD-Final | 11/15/2000 | 11/16/2000 | 11/16/2000 | A | NH |
Russ Owen
|
|
|
Larry Chase ###-#### locked out.left note to recall. 11/16/2000 12:00:35 PM
|
BLD-Other | 9/6/2000 | 9/7/2000 | 9/7/2000 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 09/06/2000 at 19:43:09. Contact: ###-####. 9/7/2000 9:55:45 AM
|
BLD-Framing/Rough-in | 8/29/2000 | 8/29/2000 | 8/29/2000 | P | PART |
Jim Storey
|
|
|
Royster ###-#### reinspection from Perry corrections 2nd truss from north gable top chord cut to supply repair and be reinsp. befor attic is insulated. c/n left and ok to rock access in truss location at ridge vent. 8/29/2000 3:49:49 PM
|
BLD-Framing/Rough-in | 8/29/2000 | 8/29/2000 | 8/29/2000 | P | PART |
Jim Storey
|
|
|
###-####- MURRY R/I
|
BLD-Framing/Rough-in | 8/25/2000 | 8/25/2000 | 8/25/2000 | P | PART |
|
|
|
###-#### c/n issued ok to insulate oly 8/25/2000 5:59:37 PM
|
BLD-Framing/Rough-in | 8/18/2000 | 8/21/2000 | 8/21/2000 | A | FAIL |
Russ Owen
|
|
|
Murray ###-####
8/21/2000 9:54:14 AM n 8/21/2000 11:59:58 AM eeds all other inspections. 8/21/2000 12:00:14 PM
|