BLD-Final | 10/25/2000 | 10/26/2000 | 10/26/2000 | A | PASS |
Carl Dependahl
|
|
|
reinspection entry code 1001 ###-#### htg ok per Dix; ok for letter at office 10/26/2000 10:15:22 AM
|
BLD-Final | 10/25/2000 | 10/25/2000 | 10/25/2000 | P | PART |
Carl Dependahl
|
|
|
entry code 1001 ###-#### ;need htg, struct ok 10/25/2000 5:29:17 PM
|
BLD-Final | 10/24/2000 | 10/24/2000 | 10/24/2000 | P | FAIL |
Carl Dependahl
|
|
|
###-#### ENTRY CODE 1001, garage door inoperative 10/24/2000 5:07:13 PM
|
BLD-Energy code compliance | 9/18/2000 | 9/19/2000 | 9/19/2000 | A | PASS |
Tom Arcoraci
|
|
|
Duane ###-####
|
BLD-Framing/Rough-in | 9/18/2000 | 9/19/2000 | 9/19/2000 | A | PASS |
Tom Arcoraci
|
|
|
###-#### Duane
|
BLD-Framing/Rough-in | 9/14/2000 | 9/15/2000 | 9/15/2000 | A | PASS |
Tom Arcoraci
|
|
|
dywane ###-####
|
BLD-Framing/Rough-in | 9/13/2000 | 9/14/2000 | 9/14/2000 | A | NR |
Tom Arcoraci
|
|
|
dwayne ###-####
|
BLD-Framing/Rough-in | 9/11/2000 | 9/11/2000 | 9/11/2000 | P | PART |
Tom Arcoraci
|
|
|
shear wall Chris ###-#### ok to side 9/11/2000 5:07:40 PM
|
BLD-Framing/Rough-in | 9/7/2000 | 9/7/2000 | 9/7/2000 | P | FAIL |
Carl Dependahl
|
|
|
shear wall Chris ###-#### no plans 9/7/2000 5:16:25 PM
|
BLD-Footing | 8/10/2000 | 8/10/2000 | 8/10/2000 | P | PART |
Tom Arcoraci
|
|
|
JERAD ###-#### FT e start 8/11/2000 8:15:51 AM
|