BLD-Final | 1/26/2001 | 1/26/2001 | 1/26/2001 | P | PASS |
Jim Sly
|
|
|
fn occ doug- ###-#### -key above front door in window seal C/C issued 1/26/2001 3:29:45 PM
|
BLD-Final | 1/23/2001 | 1/24/2001 | 1/24/2001 | P | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 01/23/2001 at 11:54:04. Contact: . C/N posted. 1/24/2001 2:45:20 PM
|
BLD-Final | 1/22/2001 | 1/22/2001 | 1/22/2001 | P | NR |
Russ Owen
|
|
|
###-#### key is in seal of window above front door front door has note not to enter until 1/23/01 due to hardwood. 1/22/2001 2:44:54 PM
|
BLD-Energy code compliance | 11/9/2000 | 11/13/2000 | 11/13/2000 | A | PASS |
Jim Sly
|
|
|
|
BLD-Framing/Rough-in | 11/9/2000 | 11/13/2000 | 11/13/2000 | A | PASS |
Jim Sly
|
|
|
###-####
|
BLD-Framing/Rough-in | 11/8/2000 | 11/8/2000 | 11/8/2000 | P | PART |
Dave Hannah
|
|
|
FR INSP- DOUG-- ###-#### CELL
|
BLD-Framing/Rough-in | 11/7/2000 | 11/7/2000 | 11/7/2000 | P | FAIL |
Jim Sly
|
|
|
DOUG-- ###-#### FR INSP C/N Need appr plans. 11/7/2000 2:33:37 PM
|
BLD-Framing/Rough-in | 10/24/2000 | 10/25/2000 | 10/25/2000 | A | PART |
Tom Arcoraci
|
|
|
###-#### ok to side 10/25/2000 9:59:10 AM
|
BLD-Footing | 9/1/2000 | 9/1/2000 | 9/1/2000 | P | PART |
Alan Hauser
|
|
|
DORIAN-- ###-#### CELL FT
|