Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD00-02017
StatusExpired
Name IDAHO DEPT OF CORRECTIONS
Site Address 1299 N ORCHARD ST
Project NameSYRINGA BANK-2 & 3 FLR
Customer Number 
ePlanReviewNo
Description
(SYRINGA BANK-2ND & 3RD FLRS) To install a cementitious system over the top of the existing 12,396 sq ft 2nd & 3rd stories to level the floor per engineered approved plans on file. Sonoflow product will be installed with all partitions creating all rooms and core areas remaining in place. ACCESS TO THE TWO REQUIRED EXIT ENCLOSURES FROM ALL PORTIONS OF THESE FLOORS MUST REMAIN ACCESSIBLE WHILE FLOORS ARE OCCUPIED. (P.C.#556-00)*RMH*
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/19/200012/20/200012/20/2000APASS
DetailsTom Arcoraci
###-#### ok for perm occ 12/20/2000 11:07:24 AM
BLD-Final12/6/200012/7/200012/7/2000AFAIL
DetailsTom Arcoraci
fn occ sterling ###-#### need resubmit from eng for steel posts and arch for one hour protection of same and eng ok of welding 12/7/2000 10:41:28 AM
BLD-Framing/Rough-in11/29/200011/29/200011/29/2000PPASS
DetailsTom Arcoraci
fr insp- ###-#### sterling
BLD-Framing/Rough-in11/28/200011/28/200011/28/2000PNH
DetailsTom Arcoraci
Sterling ###-#### called phones no ans left message 11/28/2000 4:39:28 PM
BLD-Conference11/14/200011/14/200011/14/2000PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 11/14/2000 2:28:11 PM ok to photo pads
BLD-Footing11/14/200011/14/200011/14/2000PPART
DetailsDave Hannah
rebar sterling ###-####