To remodel approximately 24,001 sq.ft. of area. An 7,425 s.f. 1st floor office area of the 2 story office building, Type VN construction at the Northwest quarter, sharing a 2-hour Area Separation wall with a Type II-N building. 16,026 sq. ft. of existing "S-1" Storage area is to be remodeled for use as "F-1", Manufacturing (10,200 s.f.); "B" - Office (3,531 s.f.) office & remainder (10,653 s.f.) as "S-1" - storage / handling area per approved plans on file. The two areas of different types of construction are separated by a 2-hour area separation wall. Work to include construction of a 1-hour occupancy separation wall around a future "H6" mechanical / clean room area, not part of this permit, and finish and or remodel the manufacturing & office areas with interior non-bearing walls of non-combustible materials within the IIN portion; new rated openings through 2-hour wall; & portable partitions to create offices and support areas. NOTE: A portion of the building has been or is being finished as an "H6/H7/B/S1/F1" cleanroom & support areas under BLD99-03630 and the 2 story office portion is currently occupied per MIS00-00049 for occupancy approval. This building is fully fire sprinklered for allowable area increase. A "LETTER OF COMPLETION" IS REQUIRED AS A CONDITION OF THIS PERMIT. (P.C.#562-00)/drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Conference6/30/20036/30/20037/1/2003PPASS
DetailsCarl Dependahl
work was finalled by 406 for fire. 7/1/2003 9:41:09 AM
BLD-Conference1/16/20011/16/20011/16/2001 PASS
Reopened permit as per Dan Stuart's request.
BLD-Final9/28/20009/29/20009/29/2000APART
DetailsCarl Dependahl
fn jerry ###-#### ; noted for office area only per owner & contractor. Ok for t/o (also has previousMIS permit for office area) 9/29/2000 10:44:37 AM
FIRE-Final Inspection9/27/20009/28/20009/28/2000PPART
DetailsJoe Tawney
Jerry ###-#### OK for temp occ of office areas and associated exit corridors 9/29/2000 8:03:23 AM
BLD-Framing/Rough-in9/15/20009/18/20009/18/2000APART
DetailsTom Arcoraci
ceiling grid Jerry ###-#### partial ok for completed areas 9/18/2000 11:29:01 AM 9/18/2000 11:54:36 AM
FIRE-Sprinkler Rough-in8/30/20008/31/20008/31/2000APART
DetailsJoe Tawney
gerry ###-#### look at wall seperating breakroom and the riser room Conf on construction of riser room 8/31/2000 2:58:34 PM
BLD-Framing/Rough-in8/29/20008/30/20008/30/2000APART
DetailsCarl Dependahl
JERRY ###-#### CEILING GRID, add struts, braces at paritions. ok to tile.Met arch. onsite re: landings & exits 8/30/2000 12:12:35 PM
BLD-Framing/Rough-in8/24/20008/25/20008/25/2000AFAIL
DetailsCarl Dependahl
jerry--###-#### fr; c/n firestops, 2hr wall ass'y at new openings,etc 8/25/2000 11:42:16 AM