Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD00-02076
StatusFinaled
Name MICRON TECHNOLOGY INC
Site Address 8000 S FEDERAL WAY
Project NameMIC #1-BAY 5
Customer NumberPCS3336
ePlanReviewNo
Description
FAB 1 REMODEL SOUTH END OF BAY 5 (PCS 01-003336) * TO DEMOLISH INTERIOR PARTITIONS, SUSPENDED CEILING, CUT SLAB AND EXCAVATE TO FOUR FEET AT PLENUM 6, AND TO REMODEL THIS 800 SQ. FT. AREA WITH NEW PARTITION BETWEEN DRY ETCH BAY 5 AND PLENUM 6, NEW SUSPENDED CEILING, POUR NEW CONCRETE RETAINING WALLS AND RECESSED FOR AND RAISED FLOOR SYSTEM AT PLENUM 6 AND TO REMOVE AND REPLACE THE SECOND FLOOR FLOORING AND ADD FACILITIES CHASES. THIS WORK IS BEING DONE AT COLUMN LINE C BETWEEN COLUMN LINES 3&5. ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED COMMENT LIST. PC#572/JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/16/20011/17/20011/17/2001PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 01/16/2001 at 10:24:29. Contact: ###-####. final ok 1/17/2001 3:56:59 PM
BLD-Final12/14/200012/15/200012/15/2000ANR
DetailsJim Storey
###-#### pending others. 12/15/2000 3:36:17 PM
FIRE-Final Inspection12/14/200012/15/200012/15/2000APASS
DetailsRick Jackson
###-####
BLD-Footing10/2/200010/2/200010/2/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/02/2000 at 07:00:28. Contact: ###-####. placed with special insp. pending report. 10/2/2000 9:17:10 AM
BLD-Foundation9/25/20009/26/20009/26/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 09/25/2000 at 09:08:09. Contact: ###-####. placed w/special insp pending report. 9/26/2000 1:48:51 PM
BLD-Footing9/20/20009/21/20009/21/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 09/20/2000 at 07:26:18. Contact: ###-####. covered with special insp. 9/21/2000 8:15:34 AM
BLD-Footing9/20/20009/20/20009/20/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 09/20/2000 at 07:24:26. Contact: ###-####. rebar ok pending epoxy and concrete testing from special insp. as well as scope of wok letter. 9/20/2000 10:17:56 AM