BLD-Aging Inspection | 2/7/2008 | 2/7/2008 | 2/7/2008 | P | CANC |
Tom Arcoraci
|
|
|
|
Expired/Cancelled | 2/7/2008 | 2/7/2008 | 2/7/2008 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Conference | 12/16/2003 | 12/17/2003 | 12/17/2003 | A | PASS |
Tom Arcoraci
|
|
|
wip slow extend permit 12/17/2003 8:14:34 AM
|
BLD - Request for Extension | 12/16/2003 | 12/16/2003 | 12/16/2003 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Conference | 5/16/2003 | 5/19/2003 | 5/19/2003 | A | PART |
Jim Sly
|
|
|
call first ###-#### Needs more time to investigate approval to obtain 2nd permit (previously cancelled) to add 2nd story.....work in progress. 5/19/2003 9:06:14 AM
|
BLD-Other | 10/27/2002 | 11/1/2002 | 11/1/2002 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/27/2002 at 21:38:37. Contact: ###-####. 11/1/2002 12:11:59 PM ll most done exten 11/1/2002 12:12:16 PM permit 11/1/2002 12:12:21 PM
|
BLD-Conference | 6/10/2002 | 6/11/2002 | 6/11/2002 | A | PASS |
Tom Arcoraci
|
|
|
###-#### john needs an extension extend permit wip 6/11/2002 8:47:35 AM
|
BLD-Conference | 5/31/2001 | 6/1/2001 | 6/1/2001 | | PASS |
Tom Arcoraci
|
|
|
they need more time see linda about extend permit work in progress 6/1/2001 8:37:35 AM
|
BLD-Framing/Rough-in | 2/27/2001 | 2/27/2001 | 2/27/2001 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 02/27/2001 at 06:49:55. Contact: ###-####. wip basement and first floor ok for cover second storey not complete at this time owner will extend permit if needed 2/27/2001 4:03:58 PM
|
BLD-Framing/Rough-in | 12/28/2000 | 1/2/2001 | 1/2/2001 | P | FAIL |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 12/28/2000 at 17:17:17. Contact: ###-####. cn posted 1/2/2001 4:18:26 PM
|
BLD-Framing/Rough-in | 12/1/2000 | 12/4/2000 | 12/4/2000 | P | PART |
Tom Arcoraci
|
|
|
John Egbert ###-#### conf on roof only 12/4/2000 2:55:23 PM
|
BLD-Conference | 9/5/2000 | 9/5/2000 | 9/5/2000 | | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 9/5/2000 re eng'd fdn plans...ok to continue
|
BLD-Foundation | 9/5/2000 | 9/5/2000 | 9/5/2000 | | PART |
Carl Dependahl
|
|
|
|
BLD-Footing | 8/30/2000 | 8/30/2000 | 8/30/2000 | | PART |
Carl Dependahl
|
|
|
###-#### bsmt area, 3#4 w/ verts dowels at 18" 8/30/2000 5:38:12 PM
|
BLD-Footing | 8/30/2000 | 8/30/2000 | 8/30/2000 | | NR |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 08/30/2000 at 07:24:23. Contact: ###-####.eng'd ftg...need steel inplace 8/30/2000 9:26:45 AM
|
BLD-Footing | 8/28/2000 | 8/29/2000 | 8/29/2000 | | PART |
Carl Dependahl
|
|
|
Shelby ###-#### bsmt wip... 8/29/2000 8:42:09 AM
|