BLD-Conference | 9/5/2000 | 9/6/2000 | 9/6/2000 | A | PASS |
Tony Young
|
|
|
for conf--- don-- ###-####
framing ?s 9/6/2000 12:59:23 PM
|
BLD-Foundation | 8/30/2000 | 8/31/2000 | 8/31/2000 | P | PART |
Tony Young
|
|
|
Don ###-####
ok w/ verbal corrections, work in progress, ok to have 3 hold downs in each shear wall as long as they are eqiv. to req. uplift. 8/31/2000 2:06:12 PM
|
BLD-Conference | 8/28/2000 | 8/28/2000 | 8/28/2000 | P | PASS |
Tony Young
|
|
|
###-####
conf. on monolithic pour, ok, to do. ,,, roots, grade, etc. 8/28/2000 3:36:47 PM
|