BLD-Final | 1/22/2001 | 1/22/2001 | 1/22/2001 | P | PART |
Tony Young
|
|
|
AFTER 3:30\\###-####
needs to get b.p. for revisions of plans of added square foot and finishing the basemment,,, after bond is posted for landscape and permits are obtained then final cert. of compliance can be issued,,per tony 1/22/2001 5:02:43 PM
|
BLD-Grading Inspection | 1/22/2001 | 1/22/2001 | 1/22/2001 | | BOND |
Rita DeYoung
|
|
|
Rough grading is complete. Fine grading, revegetation and retaining walls are not. the engineer has recommended a bond of $1550.00 for the incomplete work. Upon receipt of this bond the grading is conditionally approved.
|
BLD-Final | 1/18/2001 | 1/19/2001 | 1/19/2001 | P | CANC |
Tony Young
|
|
|
Gary ###-#### please call before you go out so that he can meet you over there...
|
BLD-Energy code compliance | 11/20/2000 | 11/20/2000 | 11/20/2000 | P | PASS |
Tony Young
|
|
|
gary ###-#### enrgy code
|
BLD-Framing/Rough-in | 11/15/2000 | 11/16/2000 | 11/16/2000 | P | PART |
Tony Young
|
|
|
gary ###-####
ok to insulate 11/16/2000 3:37:06 PM
|
BLD-Framing/Rough-in | 11/1/2000 | 11/1/2000 | 11/1/2000 | P | PART |
Tony Young
|
|
|
SHEAR WALL\\###-####
|
BLD-Framing/Rough-in | 10/27/2000 | 10/30/2000 | 10/30/2000 | P | FAIL |
Tony Young
|
|
|
shear wall Gary ###-####
needs to be nailed off per plan 10/30/2000 4:07:37 PM
|
BLD-Framing/Rough-in | 10/27/2000 | 10/30/2000 | 10/30/2000 | A | NR |
Tony Young
|
|
|
gary ###-####
|
BLD-Framing/Rough-in | 10/30/2000 | 10/30/2000 | 10/30/2000 | P | CANC |
Tony Young
|
|
|
Scheduled by Inspector: 415 On 10/30/2000 shear panel
|
BLD-Foundation | 9/18/2000 | 9/19/2000 | 9/19/2000 | A | PART |
Tony Young
|
|
|
###-####
WIP ,,,LOOKS OK 9/19/2000 8:39:16 AM
|
BLD-Footing | 9/12/2000 | 9/12/2000 | 9/12/2000 | P | PART |
Tony Young
|
|
|
ft insp ###-#### dave
wip,,, ok w/ verbal corrections 9/12/2000 3:08:39 PM
|