BLD-Final | 2/6/2002 | 2/6/2002 | 2/6/2002 | P | PASS |
Carl Dependahl
|
|
|
Snow Leopards want a final!!..l/c only 2/6/2002 3:54:25 PM
|
BLD-Final | 1/31/2002 | 2/1/2002 | 2/1/2002 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 01/31/2002 at 10:59:29. Contact: ###-####...struct ok ( fire ok per Rick J.) referred to P&Z for final 2/1/2002 11:38:41 AM
|
Code Occupancy Approval | 2/1/2002 | 2/1/2002 | 2/1/2002 | P | PASS |
Wm. Michael Meloy
|
|
|
Scheduled by Inspector: WMM On 2/1/2002 2:31:23 PM
|
FIRE-Final Inspection | 2/1/2002 | 2/1/2002 | 2/1/2002 | A | PASS |
Rick Jackson
|
|
|
Added by Inspector: 409 On 2/1/2002 10:45:18 AM
|
BLD-Final | 1/22/2002 | 1/23/2002 | 1/23/2002 | A | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 01/22/2002 at 09:06:01. Contact: ###-####....need eng's calcs w/wet stamp for "ok as built"...recall 1/23/2002 11:26:45 AM
|
BLD-Final | 11/26/2001 | 11/26/2001 | 11/26/2001 | P | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 11/26/2001 at 07:48:58. Contact: ###-####....need arch's /eng's ok as-built 11/26/2001 3:50:11 PM
|
BLD-Final | 11/14/2001 | 11/15/2001 | 11/15/2001 | P | NR |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 11/14/2001 at 13:22:15. Contact: ###-####...need verify eng'g req'd & consult w/ Mike P. 11/15/2001 3:07:08 PM
|