BLD-Final | 10/25/2000 | 10/26/2000 | 10/26/2000 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/25/2000 at 17:24:46. Contact: ###-####. OK for Perm Occ. 10/26/2000 11:07:27 AM
|
FIRE-Final Inspection | 10/25/2000 | 10/26/2000 | 10/26/2000 | A | PASS |
Joe Tawney
|
|
|
###-####. Reinsp OK for permanant occupancy 10/26/2000 12:28:51 PM
|
Permanent Occupancy | | 10/26/2000 | 10/26/2000 | | DONE |
|
|
|
|
BLD-Final | 10/25/2000 | 10/25/2000 | 10/25/2000 | P | PASS |
Jim Sly
|
|
|
fn occ --greg ###-####
|
FIRE-Final Inspection | 10/24/2000 | 10/25/2000 | 10/25/2000 | A | FAIL |
Joe Tawney
|
|
|
FIRE FN - GREG- ###-#### Reinsp Fail Duct detectors 10/25/2000 12:09:34 PM
|
BLD-Final | 10/16/2000 | 10/17/2000 | 10/17/2000 | P | FAIL |
Jim Sly
|
|
|
Greg ###-#### NR 10/17/2000 4:48:58 PM
|
FIRE-Final Inspection | 10/17/2000 | 10/17/2000 | 10/17/2000 | P | FAIL |
Joe Tawney
|
|
|
Greg ###-#### Final Fail Alarm submittal 10/18/2000 7:58:39 AM
|
FIRE-Final Inspection | 10/16/2000 | 10/17/2000 | 10/17/2000 | A | FAIL |
Joe Tawney
|
|
|
Greg ###-#### Final Fail Alarm system duct det 10/17/2000 12:15:10 PM
|
FIRE-Conference | 10/11/2000 | 10/11/2000 | 10/11/2000 | P | PART |
Joe Tawney
|
|
|
###-####. Conf with Pat of Steed on exit door hdwre 10/12/2000 8:26:59 AM
|
BLD-Framing/Rough-in | 10/2/2000 | 10/2/2000 | 10/2/2000 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/02/2000 at 08:53:52. Contact: ###-####.
|
FIRE-Sprinkler Rough-in | 10/2/2000 | 10/2/2000 | 10/2/2000 | P | PART |
Joe Tawney
|
|
|
###-####. OK on spklr rough in 10/3/2000 7:40:30 AM
|
BLD-Framing/Rough-in | 9/11/2000 | 9/11/2000 | 9/11/2000 | P | PASS |
Jim Sly
|
|
|
greg-- ###-#### fr
|