Permit Information
Permit NumberBLD00-02195
StatusFinaled
Name BOISE HUD OFFICE
Site Address 800 PARK BLVD Unit: (2 FLR)
Project NameMK PLAZA IV - 2ND FLR
Customer Number 
ePlanReviewNo
Description
(BOISE HUD OFFICE) This building is fire sprinklered for area increase and to meet high-rise provisions. To create a 4,163 square foot office tenant space on the 2nd floor of an existing high-rise building. Work is to include selective demolition, a 1-hr tenant demising wall, a 20-minute door and 1-hr alcove at the existing 1-hr corridor (at two locations), interior non-bearing walls, interior doors, and finishes all per approved drawings and plan review conditions on file. The location of fire sprinkler heads shall comply with NFPA 13-1996 as regulated by the Fire Department. The adjacent 1,304 square foot space shall not be occupied under this permit. It shall apply for and receive its own Certificate of Occupancy before being occupied. Fire alarm plans, related data submittals, and permitting are required prior to any related work. PC-608-00 **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/27/200011/29/200011/29/2000APASS
DetailsTony Young
Mark Armstrong ###-####
cert. of occ. ok, mechanical is not needed 11/29/2000 11:51:13 AM
Permanent Occupancy 11/29/200011/29/2000 DONE
Details
FIRE-Final Inspection11/27/200011/28/200011/28/2000ACANC
DetailsTom Arcoraci
Mark Armstrong ###-####
FIRE-Final Inspection11/28/200011/28/200011/28/2000PPASS
DetailsRick Jackson
Scheduled by Inspector: 409 On 11/28/2000 2:28:15 PM
BLD-Framing/Rough-in8/24/20008/25/20008/25/2000PPART
DetailsTony Young
mark-- ###-#### fr insp
partial frame inspection for cover , ok,( look at plans where I marked) 8/25/2000 3:36:03 PM
FIRE-Conference8/23/20008/23/20008/23/2000PPART
DetailsRick Jackson
FOR CONF-- MARK ARMSTRONG-- ###-#### told Mark to talk to the structural inspector about the 1 hour corridor wall construction; must have S rating on doors to corridor 8/23/2000 4:08:17 PM