BLD-Wall cover | 9/8/2000 | 9/8/2000 | 9/8/2000 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 9/8/2000 int firewalls/ shear ok
|
BLD-Final | 8/31/2000 | 9/1/2000 | 9/1/2000 | P | PASS |
|
|
|
Scheduled by a contractor via Hello! on 08/31/2000 at 16:03:54. Contact: ###-####. made ok with 409 approvals 9/1/2000 4:07:30 PM 9/1/2000 4:07:54 PM
|
FIRE-Final Inspection | 8/31/2000 | 9/1/2000 | 9/1/2000 | P | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 08/31/2000 at 16:01:47. Contact: ###-####.
|
BLD-Framing/Rough-in | 8/25/2000 | 8/28/2000 | 8/28/2000 | A | PART |
|
|
|
Scheduled by a contractor via Hello! on 08/25/2000 at 14:37:55. Contact: ###-####. need to finish the tenant wall after the elec rough 8/28/2000 5:46:03 PM
|
BLD-Wall cover | 8/25/2000 | 8/28/2000 | 8/28/2000 | A | PART |
|
|
|
Scheduled by a contractor via Hello! on 08/25/2000 at 14:38:43. Contact: ###-####. need to address the elec panel box in the demising wall (new) 8/29/2000 10:13:24 AM
|