BLD-Final | 8/9/2001 | 8/9/2001 | 8/9/2001 | A | PASS |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 08/09/2001 at 06:41:32. Contact: ###-####. c/n ok, card to St Lukes; l/c only. 8/9/2001 1:11:20 PM
|
BLD-Final | 8/7/2001 | 8/8/2001 | 8/8/2001 | P | NR |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 08/07/2001 at 07:31:18. Contact: ###-####.recall 8/9/2001 8:31:06 AM
|
FIRE-Final Inspection | 7/12/2001 | 7/13/2001 | 7/13/2001 | A | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 07/12/2001 at 14:13:03. Contact: ###-####.
|
BLD-Conference | 7/10/2001 | 7/10/2001 | 7/10/2001 | A | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 7/10/2001 7:51:37 AM w/ bldr(St. Lukes) re verbal c/n
|
BLD-Conference | 7/9/2001 | 7/9/2001 | 7/9/2001 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 7/9/2001 3:50:04 PM need clarify changes;submit archs letter, provide other rough in & final oks
|
FIRE-Final Inspection | 7/5/2001 | 7/6/2001 | 7/6/2001 | A | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 07/05/2001 at 10:20:03. Contact: ###-####. comm cable penetration in corridor between doors to be fixed for structural inspector 7/6/2001 9:01:40 AM
|
BLD-Conference | 6/14/2001 | 6/14/2001 | 6/14/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 6/14/2001 2:20:42 PM reactivate, expired in error
|