BLD-Framing/Rough-in | 11/10/2000 | 11/13/2000 | 11/13/2000 | A | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 11/10/2000 at 11:32:28. Contact: .
ok to insulate and sheetrock 11/13/2000 10:41:02 AM
|
BLD-Framing/Rough-in | 11/7/2000 | 11/8/2000 | 11/8/2000 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 11/07/2000 at 16:16:11. Contact: .
Tony Gabnell ###-####, exterior shear ok, ok to side, still need electrical rough inspection 11/8/2000 11:13:28 AM
|
BLD-Framing/Rough-in | 11/6/2000 | 11/7/2000 | 11/7/2000 | A | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 11/06/2000 at 14:33:37. Contact: . issued c/n, needs shear nailing and strap on framing at top plates--back wall. 11/7/2000 11:22:12 AM
|