BLD-Final | 2/26/2001 | 2/27/2001 | 2/27/2001 | A | PASS |
Dave Hannah
|
|
|
###-####
|
BLD-Final | 2/23/2001 | 2/26/2001 | 2/26/2001 | A | CANC |
Dave Hannah
|
|
|
###-####
|
BLD-Energy code compliance | 12/7/2000 | 12/8/2000 | 12/8/2000 | A | PASS |
Tom Arcoraci
|
|
|
Ron ###-####
|
BLD-Energy code compliance | 12/4/2000 | 12/5/2000 | 12/5/2000 | A | NR |
Russ Owen
|
|
|
Ron ###-####HOUSE NOT INSULATED AT THIS TIME
|
BLD-Framing/Rough-in | 12/1/2000 | 12/1/2000 | 12/1/2000 | P | PART |
Dave Hannah
|
|
|
###-#### PLANS ARE ABOVE ELE PANELok to insulate 12/1/2000 12:51:19 PM
|
BLD-Framing/Rough-in | 11/2/2000 | 11/3/2000 | 11/3/2000 | A | PART |
Tom Arcoraci
|
|
|
###-#### ok to side 11/2/2000 4:30:55 PM
|
BLD-Framing/Rough-in | 10/30/2000 | 10/30/2000 | 10/30/2000 | P | FAIL |
Dave Hannah
|
|
|
ron ###-####
|
BLD-Foundation | 10/3/2000 | 10/3/2000 | 10/3/2000 | P | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/03/2000 at 08:03:18. Contact: ###-####. Poured W/O inspection....2:45 PM.. No calls. 10/3/2000 3:07:14 PM
|
BLD-Footing | 10/2/2000 | 10/2/2000 | 10/2/2000 | P | PART |
Tom Arcoraci
|
|
|
eng garage walls idaho truss
10/2/2000 2:06:42 PM
|