BLD-Final | 2/26/2001 | 2/27/2001 | 2/27/2001 | A | PASS |
Dave Hannah
|
|
|
###-####
|
BLD-Final | 2/23/2001 | 2/26/2001 | 2/26/2001 | A | FAIL |
Dave Hannah
|
|
|
###-#### c/n on site 2/26/2001 9:36:25 AM
|
BLD-Energy code compliance | 11/28/2000 | 11/29/2000 | 11/29/2000 | A | PASS |
Dave Hannah
|
|
|
###-#### RON
|
BLD-Framing/Rough-in | 11/28/2000 | 11/28/2000 | 11/28/2000 | P | PART |
Dave Hannah
|
|
|
fr ron--- ###-####
|
BLD-Framing/Rough-in | 11/27/2000 | 11/27/2000 | 11/27/2000 | P | PART |
Dave Hannah
|
|
|
plans are above elec panel ###-#### -ron -ok to cover ok to insolate 11/27/2000 4:12:48 PM
|
BLD-Framing/Rough-in | 11/2/2000 | 11/3/2000 | 11/3/2000 | A | PART |
Tom Arcoraci
|
|
|
###-#### ok to side retro hds ok talked to 325 11/2/2000 4:32:28 PM
|
BLD-Framing/Rough-in | 10/30/2000 | 10/30/2000 | 10/30/2000 | P | FAIL |
Dave Hannah
|
|
|
shear wall Ron ###-####
|
BLD-Foundation | 9/22/2000 | 9/22/2000 | 9/22/2000 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 09/22/2000 at 08:50:50. Contact: ###-####. 9/22/2000 4:33:10 PM poured 9/22/2000 5:08:03 PM ithout inspection 9/22/2000 5:08:20 PM
|
BLD-Footing | 9/21/2000 | 9/21/2000 | 9/21/2000 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 09/21/2000 at 11:14:12. Contact: ###-####.
|