BLD-Final | 12/4/2000 | 12/4/2000 | 12/4/2000 | P | PASS |
Russ Owen
|
|
|
vic ###-#### fn
|
BLD-Final | 11/29/2000 | 11/29/2000 | 11/29/2000 | P | FAIL |
Russ Owen
|
|
|
vic-- ###-####--call 1st before insp.caulk ext ele energy code. 11/29/2000 11:03:12 AM
|
BLD-Energy code compliance | 9/29/2000 | 10/2/2000 | 10/2/2000 | A | PART |
Carl Dependahl
|
|
|
###-####; air seal ok. Need plbg r/i 10/2/2000 10:11:17 AM
|
BLD-Framing/Rough-in | 9/29/2000 | 10/2/2000 | 10/2/2000 | P | PASS |
Carl Dependahl
|
|
|
###-#### ok to cover, insul ok 10/2/2000 4:40:05 PM
|
BLD-Framing/Rough-in | 10/2/2000 | 10/2/2000 | 10/2/2000 | A | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 10/2/2000 ok pend plbg
|
BLD-Framing/Rough-in | 9/28/2000 | 9/28/2000 | 9/28/2000 | P | PART |
Carl Dependahl
|
|
|
shear panel ###-#### ok to side 9/28/2000 2:40:15 PM
|
BLD-Framing/Rough-in | 9/27/2000 | 9/27/2000 | 9/27/2000 | P | PART |
Carl Dependahl
|
|
|
###-####- VICTOR-- SHEAR PANEL BEFORE SIDING
|
BLD-Foundation | 9/14/2000 | 9/15/2000 | 9/15/2000 | A | PART |
Alan Hauser
|
|
|
CHRIS ###-####
|
BLD-Footing | 9/14/2000 | 9/14/2000 | 9/14/2000 | P | PASS |
|
|
|
chris ###-#### r-bar placed ok to pour 9/14/2000 4:09:19 PM
|