BLD-Final | 9/11/2001 | 9/11/2001 | 9/11/2001 | P | PASS |
Dave Hannah
|
|
|
###-#### all c/n items completed 9/11/2001 2:26:43 PM
|
BLD-Final | 9/6/2001 | 9/10/2001 | 9/10/2001 | A | FAIL |
Dave Hannah
|
|
|
bee bee ###-#### fn needs smoke detectors landing out back door of bed room and elec and plb finals 9/10/2001 10:39:17 AM
|
BLD-Framing/Rough-in | 3/22/2001 | 3/23/2001 | 3/23/2001 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 03/22/2001 at 21:59:23. Contact: . 3/23/2001 1:37:49 PM 3/23/2001 2:03:26 PM
|
BLD-Framing/Rough-in | 3/9/2001 | 3/12/2001 | 3/12/2001 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 03/09/2001 at 12:40:37. Contact: ###-####. shear panels ok to cover out side 3/12/2001 4:24:02 PM
|
BLD-Footing | 8/16/2000 | 8/16/2000 | 8/16/2000 | P | PART |
Tom Arcoraci
|
|
|
FT JERRY-- ###-#### pwiaok 8/16/2000 4:38:30 PM
|