BLD-Final | 2/13/2001 | 2/14/2001 | 2/14/2001 | A | PASS |
Jim Sly
|
|
|
###-#### key under mat C/C issued. 2/14/2001 12:07:31 PM
|
BLD-Wall cover | 10/30/2000 | 10/31/2000 | 10/31/2000 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/30/2000 at 09:35:02. Contact: ###-####.
|
BLD-Framing/Rough-in | 10/27/2000 | 10/27/2000 | 10/26/2000 | A | PART |
Dave Hannah
|
|
|
CN issued. OK to insulate.
|
BLD-Framing/Rough-in | 10/25/2000 | 10/26/2000 | 10/26/2000 | A | CANC |
Jim Sly
|
|
|
Bobbie ###-#### Done by 425 10/26/2000 10:41:18 AM
|
BLD-Conference | 10/10/2000 | 10/10/2000 | 10/10/2000 | P | PART |
Jim Sly
|
|
|
for conf-- bobbi ###-####
|
BLD-Framing/Rough-in | 10/4/2000 | 10/5/2000 | 10/5/2000 | A | FAIL |
Jim Sly
|
|
|
shear Bobbie ###-#### NR 10/5/2000 9:58:58 AM
|
BLD-Framing/Rough-in | 10/5/2000 | 10/5/2000 | 10/5/2000 | P | PART |
Jim Sly
|
|
|
SHEAR BOBBI ###-#### Shear OK 10/5/2000 1:44:43 PM
|
BLD-Foundation | 9/8/2000 | 9/11/2000 | 9/11/2000 | A | FAIL |
Tom Arcoraci
|
|
|
JACK ###-#### FOUND WALL INSP poured without insp no plans on site 9/11/2000 11:07:35 AM
|
BLD-Footing | 9/6/2000 | 9/7/2000 | 9/7/2000 | A | PART |
Jim Sly
|
|
|
early start permit Jack ###-####
|