BLD-Final | 1/9/2001 | 1/9/2001 | 1/9/2001 | P | PASS |
Tom Arcoraci
|
|
|
###-#### lc issued 1/9/2001 4:30:14 PM
|
BLD-Framing/Rough-in | 10/18/2000 | 10/18/2000 | 10/18/2000 | P | PASS |
Jim Storey
|
|
|
shear randy ###-#### interior ok 10/18/2000 3:14:12 PM
|
BLD-Energy code compliance | 10/11/2000 | 10/12/2000 | 10/12/2000 | A | PASS |
Jim Storey
|
|
|
###-#### c/n ok ec ok for cover. 10/11/2000 4:54:50 PM
|
BLD-Energy code compliance | 10/10/2000 | 10/11/2000 | 10/11/2000 | A | FAIL |
Tom Arcoraci
|
|
|
###-#### cn posted last cn not on site no plans 10/11/2000 11:18:48 AM
|
BLD-Framing/Rough-in | 10/6/2000 | 10/10/2000 | 10/10/2000 | A | PART |
Jim Storey
|
|
|
vicky ###-#### load point 6000 lbs at girder truss south end and two laddarl braces. noted on truss engineering. 10/10/2000 9:32:04 AM
|
BLD-Framing/Rough-in | 9/26/2000 | 9/27/2000 | 9/27/2000 | A | PART |
Jim Storey
|
|
|
sheer insp Randy ###-#### exterior ok only. 9/27/2000 3:18:18 PM
|
BLD-Foundation | 8/24/2000 | 8/25/2000 | 8/25/2000 | A | PART |
Jim Storey
|
|
|
Tony ###-#### early start 8/25/2000 9:44:42 AM
|
BLD-Footing | 8/24/2000 | 8/24/2000 | 8/24/2000 | P | PART |
Jim Storey
|
|
|
###-#### early start. 8/25/2000 9:45:06 AM
|